Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - LCBU - Framing
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2024 | COT - LCBU - Framing | Re-inspection required | 2/14/24: first floor framing corrections need to be made regarding missing columns and blocking's above columns. Holdowns missing at interior shear walls at first floor, anchor bolts at interior shear walls missing throughout. Pending inspection on other floors. | |
| 02/15/2024 | COT - LCBU - Framing | Partial Pass | 2/14/24: first floor framing corrections need to be made regarding missing columns and blocking's above columns. Holdowns missing at interior shear walls at first floor, anchor bolts at interior shear walls missing throughout. Pending inspection on other floors. 2/15/24: second floor corrections need to be made regarding blocking above columns. |
|
| 02/16/2024 | COT - LCBU - Framing | Partial Pass | 2/16/24: Third floor good to go per Ernie Stevens. Partial-pass. | |
| 03/01/2024 | COT - LCBU - Framing | Partial Pass | 2/14/24: first floor framing corrections need to be made regarding missing columns and blocking's above columns. Holdowns missing at interior shear walls at first floor, anchor bolts at interior shear walls missing throughout. Pending inspection on other floors. 2/15/24: second floor corrections need to be made regarding blocking above columns. 2/16/24: Third floor good to go per Ernie Stevens. Partial-pass. 3/1/24: corrections made at first and second floor. Ok to proceed with intermediates . |
|
| 03/25/2024 | COT - LCBU - Framing | Passed |