Permit: TC-MDP-0523-01099
Permit Details
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01099
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/10/2024 | APPROVED |
06/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
07/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/08/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01099
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
12/10/2024 | AIR BALANCING REPORT IS REQUIRED. |
12/10/2024 | COMMISSIONING REPORT IS REQUIRED. |
12/10/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0523-01099
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/16/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01099
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/04/2024 | COT - LCPL - Yard Water Line | N/A | Partial Pass | 3/4/24: partial pass pending back flow preventer connection. (15' run under pressure) |
11/20/2024 | COT - LCME - Mechanical Above Ceiling | N/A | Partial Pass | 11/20/24: second floor above ceiling passed. |
11/20/2024 | COT - LCBU - Building Above Ceiling | N/A | Partial Pass | 11/20/24: second floor above ceiling passed. |
11/20/2024 | COT - LCPL - Plumbing Above Ceiling | N/A | Partial Pass | 11/20/24: second floor above ceiling passed. |
11/25/2024 | COT - LCEL - Electrical Intermediate | N/A | Partial Pass | 11/20/24: second floor above ceiling passed. 11/22/24: canceled per Horus 11/25/24: M.E.P at second floor passed ok to proceed |
11/25/2024 | COT - LCEL - Electrical Above Ceiling | N/A | Partial Pass | 11/20/24: second floor above ceiling passed. 11/22/24: canceled per Horus 11/25/24: M.E.P at second floor passed ok to proceed |
11/25/2024 | COT - LCME - Mechanical Intermediate | N/A | Partial Pass | 11/25/24: M.E.P at second floor passed ok to proceed |
11/25/2024 | COT - LCBU - Framing | N/A | Partial Pass | |
11/27/2024 | COT - LCPL - Plumbing Intermediate | N/A | Re-inspection required | 11-27-24, dwv has leak. Contractor will reschedule inspection at later date. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01099
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2023 | COT - LCPL - Rough Soil | Passed | ||
03/07/2024 | COT - LCEL - Electrical Underground | Passed | ||
03/07/2024 | COT - LCEL - Grounding/Bonding | Passed | 3/7/24: reinforcement per plan ok to pour footings and slab. | |
03/07/2024 | COT - LCBU - Excavation/Rebar/Zoning | Passed | 3/7/24: reinforcement per plan ok to pour footings and slab. | |
03/07/2024 | COT - LCBU - Preslab | Passed | 3/7/24: reinforcement per plan ok to pour footings and slab. | |
03/27/2024 | COT - LCPL - Sewer | Passed | 3/27/24: HCS connection made ok to backfill. | |
05/17/2024 | COT - LCPL - Yard Water Line | Passed | ||
08/19/2024 | COT - LCBU - Roof Nailing | Passed | ||
08/26/2024 | COT - BULD - SWG Clearance | Passed | ||
08/26/2024 | COT - LCPL - Gas Pressure Test | Passed | ||
09/10/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | 9/10/2024 2nd floor exterior clips and sheathing approved. |