Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-01095
Permit Details
Apply Date:
05/29/2023
Applicant:
Erin Dick
Description:
Building A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01095
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/29/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/08/2024 | APPROVED |
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01095
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
08/08/2024 | AIR BALANCING REPORT IS REQUIRED. |
08/08/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0523-01095
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01095
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2024 | COT - LCBU - Roof Nailing | N/A | Partial Pass | 2/7/24: deck nailing at 2nd floor per plan ok to proceed. |
02/07/2024 | COT - LCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 2/7/24: (3) H3 total holdowns missing at first floor engineer fix must be provided for embedded holdowns, |
07/31/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | 7/31/24: not ready |
10/17/2023 | COT - LCPL - Yard Water Line | N/A | Partial Pass | 10/17/23: main water service stub-in tested at 60 psi |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01095
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/19/2023 | COT - LCPL - Rough Soil | Passed | ||
11/08/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
11/08/2023 | COT - LCEL - Electrical Underground | Passed | ||
11/08/2023 | COT - LCBU - Preslab | Passed | ||
11/08/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
03/04/2024 | COT - LCPL - Sewer | Passed | 3/4/24: HCS connection made ok to backfill. Shading required. | |
03/12/2024 | COT - LCBU - Roof Nailing | Passed | ||
06/21/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
06/21/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
06/21/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
06/21/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
06/21/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
06/25/2024 | COT - LCPL - Plumbing Intermediate | Passed | 6/21/24: 2nd floor passed. 6/25/24: 1st floor passed |
|
06/25/2024 | COT - LCME - Mechanical Intermediate | Passed | 6/21/24: 2nd floor passed. 6/25/24: 1st floor passed |
|
06/25/2024 | COT - LCEL - Electrical Intermediate | Passed | 6/21/24: 2nd floor passed. 6/25/24: 1st floor passed |
|
06/25/2024 | COT - LCBU - Framing | Passed | ||
08/02/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/17/2024 | COT - LCPL - Yard Water Line | Passed | ||
09/17/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. BUILDING #9 SOUTHSIDE METER NUMBERS. #9107,#9207,#9208,#9206,#9106,#9105,#9205,#9108. NORTHSIDE METER NUMBERS. #9204,#9203,#9104,CHARGING STATIONS,#9201,#9101,#9202,HOUSE PANEL,#9103,#9102. 9/17/2024 |