Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building A two-story, 16 unit, apartment building model plans.

Permit Reviews

Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date Submittal Complete Date Status  
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2024 REQUIRES RESUBMIT Review Details
06/28/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/08/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 2
Date Name
07/24/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
07/24/2023 WATER STERILIZATION REPORT IS REQUIRED.

Conditions

Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date Description Comments
04/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01094
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
09/25/2023 COT - LCPL - Rough Soil N/A Partial Pass 9/25/23: rough soil for building #8 approved.
03/05/2024 COT - LCPL - Sewer N/A Not Ready 3/5/24: not ready
03/01/2024 COT - LCBU - Exterior Clips/Sheathing N/A Partial Pass 3/1/24: first floor exterior clip and sheathing passed. Pending RFI at holdown obstructing unit door way passage way
03/04/2024 COT - LCBU - Framing N/A Partial Pass 3/4/24: first floor framing missing columns throughout, ok to proceed. Will revisit corrections at second floor framing inspection.
07/31/2024 COT - HCBU - Interior Shear Bracing N/A Not Ready 7/31/24: not ready

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0523-01094
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 19
Date Description Inspector Results Comments
11/01/2023 COT - LCPL - Yard Water Line Passed
11/15/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
11/15/2023 COT - LCBU - Preslab Passed
11/15/2023 COT - LCEL - Electrical Underground Passed
11/15/2023 COT - LCEL - Grounding/Bonding Passed
03/05/2024 COT - LCPL - Rough Soil Passed
03/07/2024 COT - LCPL - Sewer Passed 3/5/24: not ready
3/7/24: ok to backfill. Shading required
04/08/2024 COT - LCBU - Roof Nailing Passed
04/10/2024 COT - LCBU - Exterior Clips/Sheathing Passed
07/12/2024 COT - LCBU - Building Above Ceiling Passed
07/12/2024 COT - LCEL - Electrical Above Ceiling Passed
07/12/2024 COT - LCEL - Electrical Intermediate Passed
07/12/2024 COT - LCME - Mechanical Above Ceiling Passed
07/12/2024 COT - LCPL - Plumbing Above Ceiling Passed
07/12/2024 COT - LCPL - Plumbing Intermediate Passed
07/12/2024 COT - LCME - Mechanical Intermediate Passed
07/12/2024 COT - LCBU - Framing Passed
08/02/2024 COT - HCBU - Interior Shear Bracing Passed
09/30/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO BUILDING #8. NORTHSIDE. 8107,8207,8106,8108,8206,8105,8205,8208.
SOUTHSIDE. 8204,8203,8103,8201,8101,8104,charging stations,8202,8102,house panel. 9/30/2024

Documents

File Name Document Type  
EES_240805_SIC_FINAL_BLDG8_COMBINED-2024-08-05_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_8_SPECIAL INSPECTION CERT-2023-06-20_V1.PDF DOCUMENTS VIEW
EES_230620_ SITE PLANS (BLDG 8)_V1.PDF DOCUMENTS VIEW