Permit: TC-MDP-0523-01094
Permit Details
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | REQUIRES RESUBMIT |
06/28/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/08/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/24/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. |
07/24/2023 | WATER STERILIZATION REPORT IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0523-01094
Permit Status: Issued
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01094
Permite Description: Building A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2023 | COT - LCPL - Rough Soil | N/A | Partial Pass | 9/25/23: rough soil for building #8 approved. |
03/05/2024 | COT - LCPL - Sewer | N/A | Not Ready | 3/5/24: not ready |
03/01/2024 | COT - LCBU - Exterior Clips/Sheathing | N/A | Partial Pass | 3/1/24: first floor exterior clip and sheathing passed. Pending RFI at holdown obstructing unit door way passage way |
03/04/2024 | COT - LCBU - Framing | N/A | Partial Pass | 3/4/24: first floor framing missing columns throughout, ok to proceed. Will revisit corrections at second floor framing inspection. |
07/31/2024 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | 7/31/24: not ready |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0523-01094
Permit Description: Building A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/01/2023 | COT - LCPL - Yard Water Line | Passed | ||
11/15/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
11/15/2023 | COT - LCBU - Preslab | Passed | ||
11/15/2023 | COT - LCEL - Electrical Underground | Passed | ||
11/15/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
03/05/2024 | COT - LCPL - Rough Soil | Passed | ||
03/07/2024 | COT - LCPL - Sewer | Passed | 3/5/24: not ready 3/7/24: ok to backfill. Shading required |
|
04/08/2024 | COT - LCBU - Roof Nailing | Passed | ||
04/10/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | ||
07/12/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
07/12/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
07/12/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
07/12/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
07/12/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
07/12/2024 | COT - LCPL - Plumbing Intermediate | Passed | ||
07/12/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
07/12/2024 | COT - LCBU - Framing | Passed | ||
08/02/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
09/30/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO BUILDING #8. NORTHSIDE. 8107,8207,8106,8108,8206,8105,8205,8208. SOUTHSIDE. 8204,8203,8103,8201,8101,8104,charging stations,8202,8102,house panel. 9/30/2024 |