Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: ENGR Engineering Final

Date Description Inspector Results Comments
01/09/2025 ENGR Engineering Final Partial Pass This is a partial pass, ada rail required on the north side walkway/ramp, pitch is 7.3% to 7.5%.
01/14/2025 ENGR Engineering Final Passed