Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.

Permit Reviews

Permit Number - TC-MDP-0523-01090
Permit Status: Complete
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Start Date Submittal Complete Date Status  
07/02/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/03/2024 REQUIRES RESUBMIT Review Details
10/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/15/2024 APPROVED Review Details
06/28/2023 COMMERCIAL REVIEW - FULL v.1 07/24/2023 APPROVED Review Details
11/01/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/05/2024 APPROVED Review Details
08/05/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0523-01090
Permit Status: Complete
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Date Description Comments
07/24/2023 AIR BALANCING/COMMISSIONING REPORT IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/24/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
04/19/2023 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
10/15/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01090
Permite Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/08/2023 COT - LCBU - Roof Nailing N/A Partial Pass 12/8/23: second floor deck nailing per schedule ok to proceed.
02/15/2024 COT - LCBU - Framing N/A Partial Pass 1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed.
1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed.
2/15/24: framing at building 4 passed. detail approves shot pins at 18” O.C at 2 story building at interior shear walls.
06/14/2024 COT - LCPL - Gas Pressure Test N/A Not Applicable
10/30/2024 ENGR Engineering Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0523-01090
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 27
Date Description Inspector Results Comments
09/29/2023 COT - LCPL - Yard Water Line Passed
10/11/2023 COT - LCEL - Grounding/Bonding Passed
10/11/2023 COT - LCEL - Electrical Underground Passed
10/11/2023 COT - LCBU - Preslab Passed
10/11/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
01/17/2024 COT - LCBU - Roof Nailing Passed 12/8/23: second floor deck nailing per schedule ok to proceed.
1/17/24: roof nailing per schedule ok to proceed.
01/29/2024 COT - LCPL - Rough Soil Passed
01/29/2024 COT - LCPL - Sewer Passed 1/29/24: connection made
02/15/2024 COT - LCBU - Exterior Clips/Sheathing Passed 1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed.
1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed.
2/15/24: framing at building 4 passed.
06/07/2024 COT - LCBU - Framing Passed 2/14/24: framing inspection passed first floor . Pending Anchor bolt fix throughout at shear walls on foundation.
1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed.
1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed.
2/15/24: framing at building 4 passed.
6/7/24: framing at second floor passed.
06/07/2024 COT - LCEL - Electrical Above Ceiling Passed
06/07/2024 COT - LCPL - Plumbing Above Ceiling Passed
06/07/2024 COT - LCPL - Plumbing Intermediate Passed 6/7/24: intermediates at 2nd floor passed.
06/07/2024 COT - LCBU - Building Above Ceiling Passed
06/10/2024 COT - LCEL - Electrical Intermediate Passed
06/10/2024 COT - LCME - Mechanical Intermediate Passed
06/10/2024 COT - LCME - Mechanical Above Ceiling Passed
07/16/2024 COT - HCBU - Interior Shear Bracing Passed
08/08/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. BUILDING #4. (SOUTHSIDE) Units #4207, #4107, #4208, #4108, #4205, #4105, #4206, and #4106. (NORTHSIDE) Units #4101, #4202, #4201, #4204, #4203, #4104, #charging stations, #4103, #4102, #house panel. 8/8/2024
08/08/2024 COT - BULD - SWG Clearance Passed
10/29/2024 COT - LCPL - Plumbing Final Passed
10/29/2024 COT - LCME - Mechanical Final Passed
10/29/2024 COT - LCEL - Electrical Final Passed
10/30/2024 TRSP - ROW - Final/Close-Out Passed no impact to right of way, existing traffic control on site for separate job
10/30/2024 COT - LCEL - Outdoor Lighting Passed
10/31/2024 ENGR Engineering Final Passed
11/01/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
EES_241031_WATER_CHLORINATION_REPORT_BLDG4-2024-11-01_V1.PDF DOCUMENTS VIEW
EES_241014_AIR_BALANCE_REPORT_BLDG4_V1.PDF DOCUMENTS VIEW
EES_240805_SIC_FINAL_BUILDING11_COMBINED-2024-08-05_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
EES_210223_GEOTECH_REPORT_V1.PDF DOCUMENTS VIEW
EES_230530_BUILDING_4_SPECIAL INSPECTION CERT-2023-06-20_V1.PDF DOCUMENTS VIEW
EES_230620_ SITE PLANS (BLDG 4)_V1.PDF DOCUMENTS VIEW