Permit: TC-MDP-0523-01090
Permit Details
Apply Date:
05/29/2023
Applicant:
HSLCS Permits
Description:
Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Permit Reviews
Permit Number - TC-MDP-0523-01090
Permit Status: Complete
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | REQUIRES RESUBMIT |
10/14/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/15/2024 | APPROVED |
06/28/2023 | COMMERCIAL REVIEW - FULL v.1 | 07/24/2023 | APPROVED |
11/01/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/05/2024 | APPROVED |
08/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01090
Permit Status: Complete
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Date | Description | Comments |
---|---|---|
07/24/2023 | AIR BALANCING/COMMISSIONING REPORT IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
07/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
04/19/2023 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
04/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/30/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/19/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
10/15/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01090
Permite Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/08/2023 | COT - LCBU - Roof Nailing | N/A | Partial Pass | 12/8/23: second floor deck nailing per schedule ok to proceed. |
02/15/2024 | COT - LCBU - Framing | N/A | Partial Pass | 1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed. 1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed. 2/15/24: framing at building 4 passed. detail approves shot pins at 18” O.C at 2 story building at interior shear walls. |
06/14/2024 | COT - LCPL - Gas Pressure Test | N/A | Not Applicable | |
10/30/2024 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01090
Permit Description: Building Encantada at La Estancia Bldg A two-story, 16 unit, apartment building model plans.
Total Completed Inspections - 27
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | COT - LCPL - Yard Water Line | Passed | ||
10/11/2023 | COT - LCEL - Grounding/Bonding | Passed | ||
10/11/2023 | COT - LCEL - Electrical Underground | Passed | ||
10/11/2023 | COT - LCBU - Preslab | Passed | ||
10/11/2023 | COT - LCBU - Excavation/Rebar/Zoning | Passed | ||
01/17/2024 | COT - LCBU - Roof Nailing | Passed | 12/8/23: second floor deck nailing per schedule ok to proceed. 1/17/24: roof nailing per schedule ok to proceed. |
|
01/29/2024 | COT - LCPL - Rough Soil | Passed | ||
01/29/2024 | COT - LCPL - Sewer | Passed | 1/29/24: connection made | |
02/15/2024 | COT - LCBU - Exterior Clips/Sheathing | Passed | 1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed. 1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed. 2/15/24: framing at building 4 passed. |
|
06/07/2024 | COT - LCBU - Framing | Passed | 2/14/24: framing inspection passed first floor . Pending Anchor bolt fix throughout at shear walls on foundation. 1/16/24: holdowns at first floor per plan ok to proceed. Shear walls at first floor per plan ok to proceed. 1/31/24: holdowns at second floor per plan ok to proceed. Shear walls at second floor per plan ok to proceed. 2/15/24: framing at building 4 passed. 6/7/24: framing at second floor passed. |
|
06/07/2024 | COT - LCEL - Electrical Above Ceiling | Passed | ||
06/07/2024 | COT - LCPL - Plumbing Above Ceiling | Passed | ||
06/07/2024 | COT - LCPL - Plumbing Intermediate | Passed | 6/7/24: intermediates at 2nd floor passed. | |
06/07/2024 | COT - LCBU - Building Above Ceiling | Passed | ||
06/10/2024 | COT - LCEL - Electrical Intermediate | Passed | ||
06/10/2024 | COT - LCME - Mechanical Intermediate | Passed | ||
06/10/2024 | COT - LCME - Mechanical Above Ceiling | Passed | ||
07/16/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
08/08/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. BUILDING #4. (SOUTHSIDE) Units #4207, #4107, #4208, #4108, #4205, #4105, #4206, and #4106. (NORTHSIDE) Units #4101, #4202, #4201, #4204, #4203, #4104, #charging stations, #4103, #4102, #house panel. 8/8/2024 | |
08/08/2024 | COT - BULD - SWG Clearance | Passed | ||
10/29/2024 | COT - LCPL - Plumbing Final | Passed | ||
10/29/2024 | COT - LCME - Mechanical Final | Passed | ||
10/29/2024 | COT - LCEL - Electrical Final | Passed | ||
10/30/2024 | TRSP - ROW - Final/Close-Out | Passed | no impact to right of way, existing traffic control on site for separate job | |
10/30/2024 | COT - LCEL - Outdoor Lighting | Passed | ||
10/31/2024 | ENGR Engineering Final | Passed | ||
11/01/2024 | COT - FCON - Fire - Final | Passed |