Permit: TC-MDP-0523-01062
Permit Details
Apply Date:
06/27/2023
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0523-01062
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/28/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 07/03/2023 | APPROVED |
10/02/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/02/2023 | APPROVED |
10/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/21/2024 | APPROVED |
03/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-01062
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
10/02/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/28/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
10/02/2023 | Post-Tension Inspection Report is required. | |
05/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/27/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/27/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/30/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01062
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/26/2024 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-01062
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2024 | COT - RSPL - Backwater Valve | Passed | ||
01/08/2024 | COT - RSPL - Rough Soil | Passed | ||
01/08/2024 | COT - RSPL - Sewer | Passed | ||
01/08/2024 | COT - RSPL - Yard Water Line | Passed | ||
01/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Footing are properly dug per plan, shear wall clips are attached to form work, rebar reinforcement is installed where required, rebar for Ufer ground is in place at bottom of footing, post tension cabling is properly installed and supported off the ground, and underground electrical conduit is installed for kitchen island. | |
01/19/2024 | COT - RSBU - Preslab | Passed | Footing are properly dug per plan, shear wall clips are attached to form work, rebar reinforcement is installed where required, rebar for Ufer ground is in place at bottom of footing, post tension cabling is properly installed and supported off the ground, and underground electrical conduit is installed for kitchen island. Okay to pour concrete for slab and footings. | |
01/19/2024 | COT - RSEL - Grounding/Bonding | Passed | Footing are properly dug per plan, shear wall clips are attached to form work, rebar reinforcement is installed where required, rebar for Ufer ground is in place at bottom of footing, post tension cabling is properly installed and supported off the ground, and underground electrical conduit is installed for kitchen island. Okay to pour concrete for slab and footings. | |
01/19/2024 | COT - RSEL - Electrical Underground | Passed | Footing are properly dug per plan, shear wall clips are attached to form work, rebar reinforcement is installed where required, rebar for Ufer ground is in place at bottom of footing, post tension cabling is properly installed and supported off the ground, and underground electrical conduit is installed for kitchen island. | |
03/05/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/05/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
03/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
03/26/2024 | BULD - Electrical Clearance | Passed | ||
03/26/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
04/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/06/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
06/13/2024 | COT - RSEL - Electrical Final | Passed | ||
06/13/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
06/13/2024 | RSBU - Building Final | Passed | ||
06/13/2024 | ENGR Engineering Final | Passed | ||
06/13/2024 | COT - RSME - Mechanical Final | Passed | ||
06/13/2024 | COT - RSPL - Plumbing Final | Passed |