Permit: TC-MDP-0523-00960
Permit Details
Apply Date:
06/09/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0523-00960
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/09/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/12/2023 | APPROVED |
07/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/09/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-00960
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
06/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
06/09/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
07/09/2024 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/09/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/09/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00960
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2023 | COT - BULD - SWG Clearance | N/A | Not Ready | Gas lines not under test, right wall of house not complete check for vapor barrier and weep screeds, penetration through vapor barrier at back side of loft second floor, foam bottom plate in laundry, missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. |
10/27/2023 | RSBU - Building Final | N/A | Partial Pass | Missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. |
10/27/2023 | COT - RSPL - Plumbing Final | N/A | Partial Pass | Missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. |
10/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Foam top plate at electrical service, nail plates needed at left side of garage, dwv not under test, gas lines not under test, missing nail plates by kitchen window, right wall of house not complete check for vapor barrier and weep screeds, nail plates needed at window of bottom landing of stairs, penetration through vapor barrier at back side of loft second floor, complete wiring throughout in master bathroom, foam bottom plate in laundry, missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00960
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2023 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is in place and under water test with no leaks. Backwater valve is installed. Clean-outs are located in the proper place. | |
08/18/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is in place and under water test with no leaks. Backwater valve is installed. Clean-outs are located in the proper place. | |
08/18/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches. | |
08/18/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to the water meter and under water pressure. Okay to shade pipe and backfill trench. | |
08/30/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/30/2023 | COT - RSBU - Preslab | Passed | ||
08/30/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/30/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/21/2023 | COT - RSBU - Roof Nailing | Passed | ||
09/21/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/23/2023 | BULD - Electrical Clearance | Passed | ||
11/01/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/27/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
01/26/2024 | COT - BULD - SWG Clearance | Passed | ||
02/06/2024 | RSBU - Building Final | Passed | ||
02/06/2024 | COT - RSEL - Electrical Final | Passed | ||
02/06/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/06/2024 | COT - RSME - Mechanical Final | Passed | ||
02/06/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/07/2024 | ENGR Engineering Final | Passed | Everything looks great | |
07/09/2024 | RSBU - Building Progress | Passed | ||
07/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |