Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Passed

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0523-00960

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Passed

Date Description Inspector Results Comments
07/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Foam top plate at electrical service, nail plates needed at left side of garage, dwv not under test, gas lines not under test, missing nail plates by kitchen window, right wall of house not complete check for vapor barrier and weep screeds, nail plates needed at window of bottom landing of stairs, penetration through vapor barrier at back side of loft second floor, complete wiring throughout in master bathroom, foam bottom plate in laundry, missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final.
10/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required Gas lines not under test, right wall of house not complete check for vapor barrier and weep screeds, penetration through vapor barrier at back side of loft second floor, foam bottom plate in laundry, missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final.
11/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass Missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. Proceed at risk.