Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0523-00958
Permit Details
Apply Date:
06/09/2023
Applicant:
Daria Hopkins
Description:
SFR MERI213021 T21-M0065
Permit Reviews
Permit Number - TC-MDP-0523-00958
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/09/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 06/12/2023 | APPROVED |
07/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/05/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0523-00958
Permit Status: Complete
Permit Description: SFR MERI213021 T21-M0065
Date | Description | Comments |
---|---|---|
06/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
06/09/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/09/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/02/2024 | Post-Tension Inspection Report is required. | |
06/09/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/02/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/09/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00958
Permite Description: SFR MERI213021 T21-M0065
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/30/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
10/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Foam top plate at low voltage throughout, support duct registers on all 3 sides throughout, pex lines must be 12" away from can lights or must be insulated, support 4gang box, staple wire needed by front door, missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0523-00958
Permit Description: SFR MERI213021 T21-M0065
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2023 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is in place and under water test with no leaks. Backwater valve is installed. Clean-outs are located in the proper place. | |
08/18/2023 | COT - RSPL - Rough Soil | Passed | Underground plumbing is in place and under water test with no leaks. Backwater valve is installed. Clean-outs are located in the proper place. | |
08/18/2023 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer line. Okay to shade pipes and backfill trenches. | |
08/18/2023 | COT - RSPL - Yard Water Line | Passed | Water line is connected to the water meter and under water pressure. Okay to shade pipe and backfill trench. | |
08/30/2023 | COT - RSBU - Preslab | Passed | ||
08/30/2023 | COT - RSEL - Electrical Underground | Passed | ||
08/30/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
08/30/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
09/20/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/20/2023 | COT - RSBU - Roof Nailing | Passed | ||
10/23/2023 | BULD - Electrical Clearance | Passed | 1/19/24 clearance resent | |
10/27/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
11/27/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/14/2024 | COT - RSEL - Electrical Final | Passed | ||
02/14/2024 | COT - RSME - Mechanical Final | Passed | ||
02/14/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
02/14/2024 | COT - RSPL - Plumbing Final | Passed | ||
02/29/2024 | RSBU - Building Final | Passed | Missing clean outs at second floor. Add clean outs or revise plans to show current layout of plumbing, provide updated city stamped plans with no clean outs at final. Per intermediate inspection. | |
02/14/2024 | RSBU - Building Progress | Passed | ||
02/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/30/2024 | ENGR Engineering Final | Passed | Occupied home |