Permit: TC-MDP-0426-00198
Permit Details
Status:
In Review
Type:
Model Building Permit
Address:
348 N BOATHOUSE LN
Address NEW:
348 N BOATHOUSE LN
Apply Date:
07/15/2026
Applicant:
Celina Rodriguez
Description:
Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
Permit Reviews
Permit Number - TC-MDP-0426-00198
Permit Status: In review
Permit Description: Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/17/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0426-00198
Permit Status: In review
Permit Description: Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/01/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 04/01/2026 | MANUAL J |
| 04/01/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/23/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0426-00198
Permit Status: In review
Permit Description: Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
| Date | Description | Comments |
|---|---|---|
| 04/01/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 04/01/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: In Review
Permit Number: TC-MDP-0426-00198
Permite Description: Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | 9/24/2026 Ensure ground screw is making full contact with metal box. (Exterior) Provide hangers at every 4’ to three in line next to shower p trap. Caulk marked exterior penetrations. Secure pex at powder room. Secure exhaust duct every 4’. Add nail plates to marked areas. Fire foam electrical line at landing. Provide proper listed supports for both condensation lines. Currently using nails. Tape all tares in ductwork. Receptacle to close to shower in master bathroom. Need to be relocated. Fire foam electrical line in 1st bedroom marked areas. Fire foam penetration in north west bedroom corner. Fire foam abs line in hall bathroom. Add Boca plate to and line in laundry room. |
Completed Inspections
Permit Status: In Review
Permit Number: TC-MDP-0426-00198
Permit Description: Enclaves at Tumamoc 1765 Plan (Model Master Plan TC-MDP-1225-00794)
Total Completed Inspections - 12
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2026 | COT - RSPL - Rough Soil | Passed | ||
| 08/05/2026 | COT - RSPL - Sewer | Passed | ||
| 08/05/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 08/12/2026 | COT - RSBU - Preslab | Passed | ||
| 08/12/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/27/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed | |
| 08/27/2026 | COT - RSBU - Roof Nailing | Passed | Passed | |
| 09/24/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 09/24/2026 | BULD - Electrical Clearance | Passed | Clearance to TEP ECO. 9/24/2026 | |
| 09/28/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/12/2026 | COT - RSBU - Interior Shear Bracing | Passed | Passed | |
| 11/13/2026 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 11/13/2026 |