Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/20/2025
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)

Permit Reviews

Permit Number - TC-MDP-0425-00259
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Start Date Submittal Complete Date Status  
05/22/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00259
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 4
Date Name
04/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/27/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/27/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/27/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0425-00259
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Date Description Comments
05/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00259
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/18/2025 BULD - Electrical Clearance N/A Re-inspection required 8-18-25: electrical receptacle at panel must be weather resistant
08/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 8-18-25: missing strap on DWV at bedroom 4, DWV not under test, block 4-gang box at column by kitchen, add staple to electrical awg coming out of cable cabinet, replace drywall screws at pancake box at dining room, add strap to pex at master shower, missing clamp on blue pex line and sprinkler pvc at bedroom 2

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00259
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/20/2025 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 6/20/2025
06/20/2025 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 6/20/2025
06/20/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 6/20/2025
06/27/2025 COT - RSBU - Preslab Passed
06/27/2025 COT - RSEL - Electrical Underground Passed
06/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
07/23/2025 COT - RSBU - Roof Nailing Passed 7-23-25: okay to dry-in roof
07/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7.24.25
Satisfactory corrections verified on site.
08/18/2025 COT - RSEL - Grounding/Bonding Passed 8-18-25: grounding/bonding approved.
08/18/2025 COT - RSPL - Gas Pressure Test Passed 8-18-25: gas pressure test approved.
08/19/2025 BULD - Electrical Clearance Passed 8-18-25: electrical receptacle at panel must be weather resistant

8.18.25
Electrical receptacle corrected
Approved for eco
08/19/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8-18-25: missing strap on DWV at bedroom 4, DWV not under test, block 4-gang box at column by kitchen, add staple to electrical awg coming out of cable cabinet, replace drywall screws at pancake box at dining room, add strap to pex at master shower, missing clamp on blue pex line and sprinkler pvc at bedroom 2

8.18.25
All items corrected as requested
APPROVED
09/04/2025 COT - RSBU - Interior Shear Bracing Passed
10/27/2025 COT - BULD - SWG Clearance Passed 10.27.2025
Clearance to Southwest Gas.
11/05/2025 COT - RSEL - Electrical Final Passed
11/05/2025 COT - RSEL - Outdoor Lighting Passed
11/05/2025 COT - RSME - Mechanical Final Passed
11/05/2025 COT - RSPL - Plumbing Final Passed
11/05/2025 ENGR Engineering Final Passed
11/05/2025 RSBU - Building Final Passed
11/05/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-05-20_V1.PDF DOCUMENTS VIEW