Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
06/10/2025
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)

Permit Reviews

Permit Number - TC-MDP-0425-00246
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Start Date Submittal Complete Date Status  
06/11/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/23/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0425-00246
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Activity Conditions - 4
Date Name
04/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
06/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/11/2025 Post-Installed Anchor Inspection Report is required.
06/11/2025 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0425-00246
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Date Description Comments
04/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00246
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Canceled Canceled per contractor. 8/27/2025
08/27/2025 COT - RSBU - Roof Nailing N/A Canceled Canceled per contractor. 8/27/2025
09/02/2025 BULD - Electrical Clearance N/A Not Ready 9.2.2025
Not ready.
09/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Not Ready 9.2.2025
Not ready.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0425-00246
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/10/2025 COT - RSPL - Yard Water Line Passed Passed 7/10/25 ok to backfill
07/10/2025 COT - RSPL - Sewer Passed Passed 7/10/25 ok to backfill
07/10/2025 COT - RSPL - Backwater Valve Passed Passed 7/10/25 ok to backfill
07/10/2025 COT - RSPL - Rough Soil Passed Passed 7/10/25 ok to backfill
07/18/2025 COT - RSEL - Grounding/Bonding Passed Partial pass for ufer only, will check connection at later date
07/18/2025 COT - RSBU - Preslab Passed Passed 7/18/25 ok to pour concrete
07/18/2025 COT - RSEL - Electrical Underground Passed Passed 7/18/25 ok to pour concrete
07/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 7/18/25 ok to pour concrete
08/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
08/28/2025 COT - RSBU - Roof Nailing Passed
08/28/2025 COT - RSPL - Gas Pressure Test Passed
09/03/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO
09/03/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 9/3/25
Pass
09/15/2025 COT - RSBU - Interior Shear Bracing Passed
10/27/2025 COT - BULD - SWG Clearance Passed 10.27.2025
Clearance to Southwest Gas.
11/07/2025 COT - RSEL - Electrical Final Passed
11/07/2025 COT - RSEL - Outdoor Lighting Passed
11/07/2025 COT - RSPL - Plumbing Final Passed
11/07/2025 RSBU - Building Progress Passed
11/12/2025 COT - RSME - Mechanical Final Passed 11.12.2025
Items fixed from 11.07.2025 inspection.
11/12/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
11/12/2025 RSBU - Building Final Passed 11.12.2025
Items fixed from 11.07.2025 inspection.