Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/07/2025 |
ENGR Engineering Final
|
|
Not Ready |
Rolloff blocking driveway access, pallets on sidewalk, sewer clean out needs capped, gray water clean outs need cutdown and capped. |
| 11/12/2025 |
ENGR Engineering Final
|
|
Passed |
Site is complete in accordance with approved plans. |