Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
7336 S AVENIDA OBELO
Apply Date:
04/14/2025
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)

Permit Reviews

Permit Number - TC-MDP-0425-00225
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Start Date Submittal Complete Date Status  
04/17/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/24/2025 APPROVED Review Details
05/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/28/2025 REQUIRES RESUBMIT Review Details
11/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 11/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0425-00225
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Date Description Comments
04/22/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/22/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/08/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/22/2025 Post-Tension Inspection Report is required.
04/08/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
04/08/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
04/22/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00225
Permite Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/03/2025 COT - BULD - SWG Clearance N/A Not Applicable
07/03/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0425-00225
Permit Description: Roosevelt Model SFR La Estancia (Model master plan TC-MDP-0123-00366)
Total Completed Inspections - 19
Date Description Inspector Results Comments
07/03/2025 COT - RSPL - Rough Soil Passed Plans call for a 3" line to the lav. Plans will be revised. Okay to backfill progress areas. Shading material is required. 7/3/2025
07/03/2025 COT - RSPL - Sewer Passed Plans call for a 3" line to the lav. Plans will be revised. Okay to backfill progress areas. Shading material is required. 7/3/2025
07/03/2025 COT - RSPL - Yard Water Line Passed
07/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
07/09/2025 COT - RSBU - Preslab Passed 7.9.25 footers verified, holdowns confirmed per plan, pt good, 3" clearance observed. Proper rebar observed. Ok to pour.
07/09/2025 COT - RSEL - Electrical Underground Passed 7-9-25: electrical underground approved
07/23/2025 COT - RSBU - Roof Nailing Passed 7-23-25: okay to dry -in roof and continue with construction.
07/25/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7/25/25
Pass
07/29/2025 COT - RSEL - Grounding/Bonding Passed 7.29.25
Bonding verified
08/20/2025 BULD - Electrical Clearance Passed 7.29.25
Passed, proceed
8/20/25: ECO TEP CLEARANCE
08/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 8.21.25
Approved
Minor corrections made on site during inspection
OK TO PROCEED
09/03/2025 COT - RSBU - Interior Shear Bracing Passed
11/13/2025 RSBU - Building Progress Passed Passed final 11/13/25 super unable to call finals until January
11/13/2025 ENGR Engineering Final Passed
01/06/2026 COT - RSEL - Electrical Final Passed
01/06/2026 COT - RSEL - Outdoor Lighting Passed
01/06/2026 COT - RSME - Mechanical Final Passed
01/06/2026 COT - RSPL - Plumbing Final Passed
01/06/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 49 FINAL SIC-2025-11-20_V2.PDF DOCUMENTS VIEW
SOILS REPORT_V1.PDF DOCUMENTS VIEW
Z370 ROOSEVELT TRUSS CALCS - LAYOUTS_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 49 PRE SIC-2025-04-14_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 49_V1.PDF DOCUMENTS VIEW