Permit: TC-MDP-0424-00539
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
3051 N SIBLEY MINE RD
Address NEW:
3051 N SIBLEY MINE RD
Apply Date:
06/20/2024
Applicant:
Description:
SFR K35I T21-M0034
Permit Reviews
Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/21/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/24/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 04/29/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 06/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/24/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
| Date | Description | Comments |
|---|---|---|
| 04/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/24/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00539
Permite Description: SFR K35I T21-M0034
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | BULD - Electrical Clearance | N/A | Re-inspection required | 10/15/24: Properly secure all NM cable 12" from box, seal all penetrations through top plate and vapor barrier, nail plates required throughout at pex and NM cable, thermostat wiring shall be 54" above finish floor, remove all NM cable off gusset plates, UFER clamp must be tightened and flipped for accessibility, properly secure gas piping throughout house, gas piping in bedroom north west must properly be fastened in wall, all fan fixture boxes are being secured by drywall screws. Possible leak at master shower. |
| 10/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 10/15/24: Properly secure all NM cable 12" from box, seal all penetrations through top plate and vapor barrier, nail plates required throughout at pex and NM cable, thermostat wiring shall be 54" above finish floor, remove all NM cable off gusset plates, UFER clamp must be tightened and flipped for accessibility, properly secure gas piping throughout house, gas piping in bedroom north west must properly be fastened in wall, all fan fixture boxes are being secured by drywall screws. Possible leak at master shower. |
| 12/06/2024 | COT - BULD - SWG Clearance | N/A | Re-inspection required | 12/5/24: , shut off valve not installed in attic |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00539
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2024 | COT - RSPL - Rough Soil | Passed | 8/20/24: per plans ok to backfill. Shading required | |
| 08/20/2024 | COT - RSPL - Sewer | Passed | 8/20/24: per plans ok to backfill. Shading required | |
| 08/20/2024 | COT - RSPL - Yard Water Line | Passed | 8/20/24: per plans ok to backfill. Shading required | |
| 08/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/27/2024 | COT - RSBU - Preslab | Passed | ||
| 08/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/19/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/16/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/16/2024 | BULD - Electrical Clearance | Passed | ||
| 10/16/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/11/2024 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 12/11/2024 | |
| 12/17/2024 | COT - RSEL - Electrical Final | Passed | Passed final 12/17/24 | |
| 12/17/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed final 12/17/24 | |
| 12/17/2024 | COT - RSME - Mechanical Final | Passed | Passed final 12/17/24 | |
| 12/17/2024 | COT - RSPL - Plumbing Final | Passed | Passed final 12/17/24 | |
| 12/17/2024 | ENGR Engineering Final | Passed | ||
| 12/17/2024 | RSBU - Building Final | Passed | Passed final 12/17/24 | |
| 12/17/2024 | RSBU - Building Progress | Passed | Passed final 12/17/24 |