Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
3051 N SIBLEY MINE RD
Apply Date:
06/20/2024
Applicant:
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
06/21/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 4
Date Name
04/29/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0424-00539
Permit Status: Inspections complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
04/29/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00539
Permite Description: SFR K35I T21-M0034
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
10/15/2024 BULD - Electrical Clearance N/A Re-inspection required 10/15/24: Properly secure all NM cable 12" from box, seal all penetrations through top plate and vapor barrier, nail plates required throughout at pex and NM cable, thermostat wiring shall be 54" above finish floor, remove all NM cable off gusset plates, UFER clamp must be tightened and flipped for accessibility, properly secure gas piping throughout house, gas piping in bedroom north west must properly be fastened in wall, all fan fixture boxes are being secured by drywall screws. Possible leak at master shower.
10/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 10/15/24: Properly secure all NM cable 12" from box, seal all penetrations through top plate and vapor barrier, nail plates required throughout at pex and NM cable, thermostat wiring shall be 54" above finish floor, remove all NM cable off gusset plates, UFER clamp must be tightened and flipped for accessibility, properly secure gas piping throughout house, gas piping in bedroom north west must properly be fastened in wall, all fan fixture boxes are being secured by drywall screws. Possible leak at master shower.
12/06/2024 COT - BULD - SWG Clearance N/A Re-inspection required 12/5/24: , shut off valve not installed in attic

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00539
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/20/2024 COT - RSPL - Rough Soil Passed 8/20/24: per plans ok to backfill. Shading required
08/20/2024 COT - RSPL - Sewer Passed 8/20/24: per plans ok to backfill. Shading required
08/20/2024 COT - RSPL - Yard Water Line Passed 8/20/24: per plans ok to backfill. Shading required
08/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/27/2024 COT - RSBU - Preslab Passed
08/27/2024 COT - RSEL - Electrical Underground Passed
09/19/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
09/19/2024 COT - RSBU - Roof Nailing Passed
10/15/2024 COT - RSPL - Gas Pressure Test Passed
10/16/2024 COT - RSEL - Grounding/Bonding Passed
10/16/2024 BULD - Electrical Clearance Passed
10/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/23/2024 COT - RSBU - Interior Shear Bracing Passed
12/11/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 12/11/2024
12/17/2024 COT - RSEL - Electrical Final Passed Passed final 12/17/24
12/17/2024 COT - RSEL - Outdoor Lighting Passed Passed final 12/17/24
12/17/2024 COT - RSME - Mechanical Final Passed Passed final 12/17/24
12/17/2024 COT - RSPL - Plumbing Final Passed Passed final 12/17/24
12/17/2024 ENGR Engineering Final Passed
12/17/2024 RSBU - Building Final Passed Passed final 12/17/24
12/17/2024 RSBU - Building Progress Passed Passed final 12/17/24