Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2024 |
BULD - Electrical Clearance |
|
Re-inspection required |
10/15/24: Properly secure all NM cable 12" from box, seal all penetrations through top plate and vapor barrier, nail plates required throughout at pex and NM cable, thermostat wiring shall be 54" above finish floor, remove all NM cable off gusset plates, UFER clamp must be tightened and flipped for accessibility, properly secure gas piping throughout house, gas piping in bedroom north west must properly be fastened in wall, all fan fixture boxes are being secured by drywall screws. Possible leak at master shower. |
| 10/16/2024 |
BULD - Electrical Clearance |
|
Passed |
|