Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
24 N SPRING FLOWER DR
Apply Date:
04/25/2024
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0424-00511
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
11/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/07/2024 APPROVED Review Details
04/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/06/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00511
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
05/01/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/01/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/01/2024 Post-Tension Inspection Report is required.
04/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/01/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00511
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/14/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10/14/24: missing anchor bolt at shear wall garage. Missing 6x6 post at entry
11/07/2024 COT - RSPL - Gas Pressure Test N/A Re-inspection required Only two pounds on gauge.
11/07/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Obtain gas pressure approval.
11/01/2024 RSBU - Building Progress N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00511
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/17/2024 COT - RSPL - Yard Water Line Passed
09/18/2024 COT - RSPL - Rough Soil Passed
09/18/2024 COT - RSPL - Sewer Passed
09/25/2024 COT - RSBU - Preslab Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
09/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour.
10/10/2024 COT - RSBU - Roof Nailing Passed
10/14/2024 COT - RSEL - Grounding/Bonding Passed
10/16/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/07/2024 BULD - Electrical Clearance Passed
11/06/2024 COT - RSEL - Electrical Underground Passed
11/08/2024 COT - RSPL - Gas Pressure Test Passed 11/8/24: Gas-line is under 15psi of air pressure and holding.
11/08/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/8/24: Gas-line is under 15psi of air pressure and holding. All other M, P, & E is complete. Okay to proceed with insulation and drywall installation.
01/22/2025 COT - RSBU - Interior Shear Bracing Passed
02/05/2025 COT - BULD - SWG Clearance Passed 2-5-25, okay for Southwest gas company to install gas meter. Clearance issued.
02/13/2025 RSBU - Building Progress Passed
02/13/2025 COT - RSEL - Electrical Final Passed 2-13-25, electrical final approved.
02/13/2025 COT - RSEL - Outdoor Lighting Passed 2-13-25, outdoor lighting approved.
02/13/2025 COT - RSME - Mechanical Final Passed 2-13-25, mechanical final approved.
02/13/2025 COT - RSPL - Plumbing Final Passed 2-13-25, plumbing final approved.
02/13/2025 ENGR Engineering Final Passed
02/13/2025 RSBU - Building Final Passed 2-13-25, building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
150400 PT LOT 194 COMPLETE-2024-11-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 194 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 194 SPECIAL INSPECTION CERTIFICATE-2024-04-26_V1.PDF DOCUMENTS VIEW