Permit: TC-MDP-0424-00511
Permit Details
Apply Date:
04/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0424-00511
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/07/2024 | APPROVED |
04/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/06/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00511
Permit Status: Issued
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
05/01/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
05/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
05/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
05/01/2024 | Post-Tension Inspection Report is required. | |
04/25/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/25/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
05/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00511
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/14/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 10/14/24: missing anchor bolt at shear wall garage. Missing 6x6 post at entry |
11/01/2024 | RSBU - Building Progress | N/A | Canceled | |
11/07/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | Only two pounds on gauge. |
11/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Obtain gas pressure approval. |
11/19/2024 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | Back patio gyp board running parallel with the trusses. Lower t stats per approved height. 11/19/2024 |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00511
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 12
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/17/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/18/2024 | COT - RSPL - Rough Soil | Passed | ||
09/18/2024 | COT - RSPL - Sewer | Passed | ||
09/25/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
09/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, rebar reinforcement is installed per plans, shear wall hold downs and masa clips are attached to formwork, underground pipes are properly wrapped, and Ufer ground is in place. Okay to proceed with concrete pour. | |
10/10/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/14/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/07/2024 | BULD - Electrical Clearance | Passed | ||
11/06/2024 | COT - RSEL - Electrical Underground | Passed | ||
11/08/2024 | COT - RSPL - Gas Pressure Test | Passed | 11/8/24: Gas-line is under 15psi of air pressure and holding. | |
11/08/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11/8/24: Gas-line is under 15psi of air pressure and holding. All other M, P, & E is complete. Okay to proceed with insulation and drywall installation. |