Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/31/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130

Permit Reviews

Permit Number - TC-MDP-0424-00500
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Start Date Submittal Complete Date Status  
05/31/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/04/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00500
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
Date Name
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
05/31/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/31/2024 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0424-00500
Permit Status: Issued
Permit Description: Bella Tierra Phase 3 1745-130
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00500
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 14
Date Description Inspector Results Comments
06/26/2024 COT - RSPL - Yard Water Line Passed Main water line is ran from meter box to house in trench with blue tracer wire wrapped around pex line. Water line is holding 60 # air pressure for test purposes because meters are not available yet. Okay to shade pipe and backfill trench.
06/26/2024 COT - RSPL - Rough Soil Passed Plumbing underground is complete to 5' outside building. No County approval to connect underground plumbing to main sewer line. Okay to proceed with shading pipes under slab and backfilling for compaction preparing for slab on grade.
06/26/2024 COT - RSPL - Backwater Valve Passed Main water line is ran from meter box to house in trench with blue tracer wire wrapped around pex line. Water line is holding 60 # air pressure for test purposes because meters are not available yet. Okay to shade pipe and backfill trench.
07/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/02/2024 COT - RSBU - Preslab Passed
07/02/2024 COT - RSEL - Electrical Underground Passed
07/02/2024 COT - RSEL - Grounding/Bonding Passed
07/25/2024 COT - RSBU - Roof Nailing Passed
07/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed 7/29/24: Shot pins have been installed on bottom plate of the pantry and master bedroom. Titan bolts added at garage shear wall and at locations where masa clips were nailed to studs and not bottom plate. RSP clips have been installed on north side of house. Okay to proceed with rough-in.
09/09/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed installation of insulation and drywall.
09/09/2024 COT - RSPL - Gas Pressure Test Passed Gas line is holding 15 psi of air pressure with no leaks. Okay to proceed.
09/26/2024 COT - RSBU - Interior Shear Bracing Passed
10/01/2024 COT - RSPL - Sewer Passed
10/30/2024 BULD - Electrical Clearance Passed 10-30-24, panel okay to be energized.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 46 REVISED START_V1.PDF DOCUMENTS VIEW
BTIII 46 SIC-2024-05-31_V1.PDF DOCUMENTS VIEW