Permit: TC-MDP-0424-00499
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9127 E WHITE BLUFF CT
Address NEW:
9127 E WHITE BLUFF CT
Apply Date:
04/17/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130
Permit Reviews
Permit Number - TC-MDP-0424-00499
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00499
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 04/17/2024 | Post-Tension Inspection Report is required. |
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 04/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 05/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 05/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0424-00499
Permit Status: Inspections complete
Permit Description: Bella Tierra Phase 3 1745-130
| Date | Description | Comments |
|---|---|---|
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00499
Permit Description: Bella Tierra Phase 3 1745-130
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 06/18/2024 | COT - RSPL - Rough Soil | Passed | ||
| 06/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/27/2024 | COT - RSBU - Preslab | Passed | ||
| 06/27/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/27/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/17/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation work. | |
| 08/21/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15psi of air pressure with no leaks. Okay to proceed with further work. | |
| 09/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/26/2024 | BULD - Electrical Clearance | Passed | PASSED ELECTRICAL CLEARANCE ECO 9/26/2024 | |
| 10/01/2024 | COT - RSPL - Sewer | Passed | ||
| 10/21/2024 | COT - BULD - SWG Clearance | Passed | All gas valves are installed. SWG Clearance issued to Southwest Gas Company. Okay to install meter and turn on gas. | |
| 11/13/2024 | COT - RSEL - Outdoor Lighting | Passed | pass | |
| 11/13/2024 | COT - RSPL - Plumbing Final | Passed | pass | |
| 11/13/2024 | RSBU - Building Progress | Passed | ||
| 11/15/2024 | COT - RSEL - Electrical Final | Passed | Corrections were made 11:15/25 | |
| 11/15/2024 | COT - RSME - Mechanical Final | Passed | Corrections were made 11:15/25 | |
| 11/15/2024 | ENGR Engineering Final | Passed | ||
| 11/15/2024 | RSBU - Building Final | Passed | Corrections were made 11:15/25 |