Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | ENGR Engineering Final | Not Ready | Clean outs collars need to be glued in place. Documentation is needed to show that drainage will work as planned. Both side yards appear to be higher than the rear yard which will trap water. |
|
| 11/15/2024 | ENGR Engineering Final | Passed |