Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1823 S MATH QUIZ DR
Apply Date:
06/05/2024
Applicant:
Mark Alteri
Description:
SFR CVPLAN3 T22-M0044

Permit Reviews

Permit Number - TC-MDP-0424-00496
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Start Date Submittal Complete Date Status  
06/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/07/2024 APPROVED Review Details
07/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/29/2024 APPROVED Review Details
09/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/27/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00496
Permit Status: Complete
Permit Description: SFR CVPLAN3 T22-M0044
Date Description Comments
06/06/2024 Post-Tension Inspection Report is required.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00496
Permite Description: SFR CVPLAN3 T22-M0044
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/27/2025 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00496
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/12/2024 COT - RSPL - Backwater Valve Passed
07/12/2024 COT - RSPL - Rough Soil Passed
07/12/2024 COT - RSPL - Sewer Passed
07/12/2024 COT - RSPL - Yard Water Line Passed
07/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/18/2024 COT - RSBU - Preslab Passed
07/18/2024 COT - RSEL - Electrical Underground Passed
07/18/2024 COT - RSEL - Grounding/Bonding Passed
08/22/2024 COT - RSBU - Roof Nailing Passed
08/28/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/04/2024 BULD - Electrical Clearance Passed ECO Clearance issued. Okay to energize panel.
10/30/2024 COT - RSPL - Gas Pressure Test Passed
10/30/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/18/2024 COT - RSBU - Interior Shear Bracing Passed 11/18/24: Drywall on interior shear walls is properly secured to studs per plan requirements screw pattern. Okay to proceed with tape, texture, and paint.
01/22/2025 COT - BULD - SWG Clearance Passed 1-22-25, okay for Southwest gas to install meter. Clearance issued.
01/27/2025 COT - RSEL - Electrical Final Passed
01/27/2025 COT - RSEL - Outdoor Lighting Passed
01/27/2025 COT - RSME - Mechanical Final Passed
01/27/2025 COT - RSPL - Plumbing Final Passed
01/27/2025 ENGR Engineering Final Passed
01/27/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
148981 PT LOT 61 COMPLETE-2024-09-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 61 PP FOR PERMIT _V1.PDF DOCUMENTS VIEW
CBT 61 PT CERT -2024-06-06_V1.PDF DOCUMENTS VIEW