Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00496
Permit Details
Apply Date:
06/05/2024
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN3 T22-M0044
Permit Reviews
Permit Number - TC-MDP-0424-00496
Permit Status: Issued
Permit Description: SFR CVPLAN3 T22-M0044
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/07/2024 | APPROVED |
07/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/29/2024 | APPROVED |
09/27/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/27/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00496
Permit Status: Issued
Permit Description: SFR CVPLAN3 T22-M0044
Date | Description | Comments |
---|---|---|
06/06/2024 | Post-Tension Inspection Report is required. | |
04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0424-00496
Permit Description: SFR CVPLAN3 T22-M0044
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/12/2024 | COT - RSPL - Rough Soil | Passed | ||
07/12/2024 | COT - RSPL - Sewer | Passed | ||
07/12/2024 | COT - RSPL - Yard Water Line | Passed | ||
07/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/18/2024 | COT - RSBU - Preslab | Passed | ||
07/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/18/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/28/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/04/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. Okay to energize panel. | |
10/30/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/30/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |