Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9828 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-0424-00486
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
04/18/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 04/24/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0424-00486
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 5
Date Name
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0424-00486
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00486
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/29/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Nail loose studs at marked locations, add anchor bolts to marked locations, replace or double layer cut tply in garage shear wall
07/29/2025 RSBU - Building Final N/A Re-inspection required 1-Move pipes out of attic access. 2-Flex duct is crushed. 3-AC compressor is still out of level.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00486
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/11/2025 COT - RSPL - Backwater Valve Passed Passed 4/11/25 ok to backfill
04/11/2025 COT - RSPL - Rough Soil Passed Passed 4/11/25 ok to backfill
04/11/2025 COT - RSPL - Sewer Passed Passed 4/11/25 ok to backfill
04/11/2025 COT - RSPL - Yard Water Line Passed Passed 4/11/25 ok to backfill
04/11/2025 BULD - Electrical Clearance Passed Passed 4/11/25 CLEARANCE ECO
04/17/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/17/25 ok to pour concrete
04/17/2025 COT - RSBU - Preslab Passed Passed 4/17/25 ok to pour concrete
04/17/2025 COT - RSEL - Electrical Underground Passed Passed 4/17/25 ok to pour concrete
04/17/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/17/25 ok to pour concrete
04/29/2025 COT - RSBU - Roof Nailing Passed Passed 4/29/25
05/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/1/25 corrections made
05/19/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/19/25
05/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5/20/25 corrections made
06/03/2025 COT - RSBU - Interior Shear Bracing Passed
07/08/2025 COT - BULD - SWG Clearance Passed Passed 7/8/25 CLEARANCE SWG
07/24/2025 COT - RSEL - Electrical Final Passed
07/24/2025 COT - RSEL - Outdoor Lighting Passed
07/24/2025 COT - RSME - Mechanical Final Passed
07/24/2025 COT - RSPL - Plumbing Final Passed
07/24/2025 RSBU - Building Progress Passed
07/29/2025 ENGR Engineering Final Passed Site is clean and clear. Everything is completed per plans.
07/30/2025 RSBU - Building Final Passed 7/30/25
All corrections have been made.