Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2025 | RSBU - Building Final | Partial Pass | Partial pass. Level out condenser unit. Provide post tension tag at hose bib. Provide ladder for attic access. 7/24/2025 | |
| 07/29/2025 | RSBU - Building Final | Re-inspection required | 1-Move pipes out of attic access. 2-Flex duct is crushed. 3-AC compressor is still out of level. | |
| 07/30/2025 | RSBU - Building Final | Passed | 7/30/25 All corrections have been made. |