Permit: TC-MDP-0424-00459
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9781 E GRAY HAWK DR
Address NEW:
9781 E GRAY HAWK DR
Apply Date:
04/17/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35E Model Plan
Permit Reviews
Permit Number - TC-MDP-0424-00459
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/19/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/02/2024 | APPROVED |
| 09/16/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0424-00459
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0424-00459
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35E Model Plan
| Date | Description | Comments |
|---|---|---|
| 04/19/2024 | Post-Installed Anchor Inspection Report is required. | |
| 04/19/2024 | Post-Tension Inspection Report is required. | |
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/19/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0424-00459
Permit Description: Casas del Cerrito H35E Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is connected to the main sewer line and under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 06/12/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to the main sewer line and under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
| 06/12/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is installed in trench from meter location to house and is under 60# of air pressure with no apparent leaks. Water meter has not been installed yet. Okay to proceed with shading pipe and backfilling trench. | |
| 06/18/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 06/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/21/2024 | COT - RSBU - Preslab | Passed | ||
| 07/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Exterior walls are properly secured to concrete floor with shot pins, a/b bolts, and masa clips. Shear wall is properly secured per the plan. Okay to proceed with plumbing, mechanical, and electrical rough-in. | |
| 07/01/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly nailed and secured to the top plate with nails and H2.5 clips nailed per code. Roof sheathing is properly nailed to trusses per code and plans. | |
| 07/25/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/25/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 07/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/26/24: DWV is under test, PEX water lines are under water pressure test, tub and shower is under water test, and penetrations in vapor barrier are sealed. | |
| 07/26/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/09/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/19/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 09/24/2024 | COT - RSEL - Electrical Final | Passed | PASSED BUILDING FINAL 9/24/24 CLEARANCE DGC |
|
| 09/24/2024 | COT - RSEL - Outdoor Lighting | Passed | PASSED BUILDING FINAL 9/24/24 | |
| 09/24/2024 | COT - RSME - Mechanical Final | Passed | PASSED BUILDING FINAL 9/24/24 | |
| 09/24/2024 | COT - RSPL - Plumbing Final | Passed | PASSED BUILDING FINAL 9/24/24 CLEARANCE DGC |
|
| 09/24/2024 | RSBU - Building Final | Passed | PASSED BUILDING FINAL 9/24/24 | |
| 09/24/2024 | RSBU - Building Progress | Passed | PASSED BUILDING FINAL 9/24/24 | |
| 09/26/2024 | ENGR Engineering Final | Passed |