Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
9780 E GRAY HAWK DR
Apply Date:
04/19/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35D Model Plan

Permit Reviews

Permit Number - TC-MDP-0424-00454
Permit Status: Complete
Permit Description: Casas del Cerrito H35D Model Plan
Start Date Submittal Complete Date Status  
10/29/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.2 10/29/2024 APPROVED Review Details
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2024 REQUIRES RESUBMIT Review Details
04/19/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00454
Permit Status: Complete
Permit Description: Casas del Cerrito H35D Model Plan
Date Description Comments
04/19/2024 Post-Installed Anchor Inspection Report is required.
04/17/2024 Post-Tension Inspection Report is required.
04/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/19/2024 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00454
Permit Description: Casas del Cerrito H35D Model Plan
Total Completed Inspections - 21
Date Description Inspector Results Comments
05/21/2024 COT - RSPL - Rough Soil Passed
05/21/2024 COT - RSPL - Sewer Passed
05/21/2024 COT - RSPL - Yard Water Line Passed
05/21/2024 BULD - Electrical Clearance Passed TEP ECO
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour.
05/31/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour.
06/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/21/2024 COT - RSBU - Roof Nailing Passed
07/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
07/05/2024 COT - RSPL - Gas Pressure Test Passed Gas lines are holding 15 pounds of air. Okay to proceed.
07/12/2024 COT - RSBU - Interior Shear Bracing Passed
08/27/2024 COT - BULD - SWG Clearance Passed SWG for meter only
09/11/2024 COT - RSEL - Electrical Final Passed Construction is completed. Okay to issue Certificate of Occupancy.
09/11/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed and operational per plan and city requirements.
09/11/2024 COT - RSME - Mechanical Final Passed Construction is completed. Okay to issue Certificate of Occupancy.
09/11/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Okay to issue Certificate of Occupancy.
09/11/2024 ENGR Engineering Final Passed
09/11/2024 RSBU - Building Final Passed Construction is completed. Okay to issue Certificate of Occupancy.
09/11/2024 RSBU - Building Progress Passed Construction is completed. Okay to issue Certificate of Occupancy.

Documents

File Name Document Type  
CDC FINAL SIC-2024-10-28_V2.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 36 SIC-2024-04-19_V1.PDF DOCUMENTS VIEW
CONS-CDC 36 D1_V1.PDF DOCUMENTS VIEW