Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0424-00454
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9780 E GRAY HAWK DR
Address NEW:
9780 E GRAY HAWK DR
Apply Date:
04/19/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35D Model Plan
Permit Reviews
Permit Number - TC-MDP-0424-00454
Permit Status: Complete
Permit Description: Casas del Cerrito H35D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 10/29/2024 | APPROVED |
| 09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/18/2024 | REQUIRES RESUBMIT |
| 04/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/02/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0424-00454
Permit Status: Complete
Permit Description: Casas del Cerrito H35D Model Plan
| Date | Description | Comments |
|---|---|---|
| 04/19/2024 | Post-Installed Anchor Inspection Report is required. | |
| 04/17/2024 | Post-Tension Inspection Report is required. | |
| 04/17/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 04/17/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 04/19/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0424-00454
Permit Description: Casas del Cerrito H35D Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/21/2024 | COT - RSPL - Rough Soil | Passed | ||
| 05/21/2024 | COT - RSPL - Sewer | Passed | ||
| 05/21/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 05/21/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 05/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 05/31/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly placed, shear wall hold downs and masa clips are secured to the form per the plan, subsoil is properly compacted, underground electrical for kitchen island is installed, all plumbing pipes are properly wrapped for protection, and ground wire and rods are properly installed in bottom of footer. Okay to proceed with concrete pour. | |
| 06/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 07/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation. | |
| 07/05/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are holding 15 pounds of air. Okay to proceed. | |
| 07/12/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/27/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
| 09/11/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | COT - RSEL - Outdoor Lighting | Passed | Outdoor lighting is properly installed and operational per plan and city requirements. | |
| 09/11/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | ENGR Engineering Final | Passed | ||
| 09/11/2024 | RSBU - Building Final | Passed | Construction is completed. Okay to issue Certificate of Occupancy. | |
| 09/11/2024 | RSBU - Building Progress | Passed | Construction is completed. Okay to issue Certificate of Occupancy. |