Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/05/2023
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0424-00425
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date Submittal Complete Date Status  
08/23/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details
04/10/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/17/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00425
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date Description Comments
04/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/11/2024 Post-Tension Inspection Report is required.
04/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00425
Permite Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
09/13/2024 RSBU - Building Progress N/A Canceled 9/13/24: canceled per contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00425
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/02/2024 COT - RSPL - Rough Soil Passed
07/02/2024 COT - RSPL - Sewer Passed
07/02/2024 COT - RSPL - Yard Water Line Passed
07/11/2024 COT - RSBU - Preslab Passed
07/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
07/11/2024 COT - RSEL - Electrical Underground Passed
07/11/2024 COT - RSEL - Grounding/Bonding Passed
08/15/2024 COT - RSBU - Roof Nailing Passed
08/19/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
08/28/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under a 15 psi pressure test with no leaks. Okay to proceed.
09/05/2024 BULD - Electrical Clearance Passed ECO Clearance issued to TEP.
09/11/2024 COT - RSBU - Interior Shear Bracing Passed
10/30/2024 COT - BULD - SWG Clearance Passed 10-30-24: Gas valve is installed in laundry room. Okay to install meter and turn on gas.
10/30/2024 RSBU - Building Progress Passed
11/14/2024 COT - RSEL - Electrical Final Passed
11/14/2024 COT - RSEL - Outdoor Lighting Passed
11/14/2024 COT - RSME - Mechanical Final Passed
11/14/2024 COT - RSPL - Plumbing Final Passed
11/14/2024 ENGR Engineering Final Passed
11/14/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
148792 PT LOT 66 COMPLETE-2024-08-22_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 66 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 66 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 66 SPECIAL INSPECTION CERTIFICATE-2024-04-08_V1.PDF DOCUMENTS VIEW