Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
6041 E CAMPOLINA TR
Apply Date:
04/03/2024
Applicant:
Brian Jones
Description:
Blackhawk T934 - Frasier

Permit Reviews

Permit Number - TC-MDP-0424-00391
Permit Status: Issued
Permit Description: Blackhawk T934 - Frasier
Start Date Submittal Complete Date Status  
04/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/11/2024 APPROVED Review Details
04/18/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 APPROVED Review Details
08/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/05/2025 APPROVED Review Details
05/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/30/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0424-00391
Permit Status: Issued
Permit Description: Blackhawk T934 - Frasier
Date Description Comments
04/11/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/11/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
04/11/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/11/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/02/2024 Post-Tension Inspection Report is required.
04/02/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/02/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/11/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00391
Permite Description: Blackhawk T934 - Frasier
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/18/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 7/18/24: engineer fix needs for jack trust in garage. H25s on west side of house,e missing nailing.
07/18/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 7/18/24: check all roof nailing.
11/08/2024 ENGR Engineering Final N/A Not Ready If they cut down the clean outs why didn't they glue the collars
Same with front yard clean outs

Let the plumber know that reinspect fees will be started if this doesn't get resolved on all homes.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0424-00391
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/17/2024 COT - RSPL - Rough Soil Passed
06/17/2024 COT - RSEL - Grounding/Bonding Passed
06/24/2024 COT - RSEL - Electrical Underground Passed
06/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/25/2024 COT - RSBU - Preslab Passed
07/23/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections were made. 7/23/2024
07/23/2024 COT - RSBU - Roof Nailing Passed Corrections were made. 7/23/2024
08/22/2024 COT - RSPL - Yard Water Line Passed
08/22/2024 COT - RSPL - Sewer Passed
08/23/2024 BULD - Electrical Clearance Passed 8/22/24: not ready
8/23/24: TEP ECO CLEARANCE FOR 6041 E CAMPOLINA TR
08/23/2024 COT - RSPL - Gas Pressure Test Passed
08/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 8/26/2024
09/10/2024 RSBU - Building Progress Passed front entry reinforcement per plan along with footers. okay for concrete placement. 9/10/2024
09/10/2024 COT - RSBU - Interior Shear Bracing Passed Passed shear wall inspection 9//10/2024
11/06/2024 COT - BULD - SWG Clearance Passed 11-6-24, approved for Southwest gas connection.
11/06/2024 COT - RSEL - Outdoor Lighting Passed 11-6-24, outdoor lighting final approved.
11/12/2024 COT - RSPL - Plumbing Final Passed 11/12/24. Pass
11/12/2024 COT - RSEL - Electrical Final Passed 11/12/24. Pass
11/12/2024 COT - RSME - Mechanical Final Passed 11/12/24. Pass
11/13/2024 ENGR Engineering Final Passed CO Ready
11/14/2024 RSBU - Building Final Passed 11-14-24, verified insulation, building final approved.

Documents

File Name Document Type  
5208012025-2025-07-31_V2.PDF DOCUMENTS VIEW
11184 ALL PLANS-EPOXY ANCHOR SPECIAL INSPECTION-LETTER-2025-04-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK LOT 52_ SIC-2024-04-03_V1.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 52 START_03.27.24_V1.PDF DOCUMENTS VIEW