Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-0424-00391
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/29/2024 | ENGR Engineering Final | Not Ready | cut down cleanouts on east side of sfr | |
11/06/2024 | ENGR Engineering Final | Not Ready | Clean outs front yard cut down to grade or hide behind landscaping rock. Clean outs on side of home need to be glued down. |
|
11/08/2024 | ENGR Engineering Final | Not Ready | If they cut down the clean outs why didn't they glue the collars Same with front yard clean outs Let the plumber know that reinspect fees will be started if this doesn't get resolved on all homes. |
|
11/13/2024 | ENGR Engineering Final | Passed | CO Ready |