Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
762 W PRESIDENT ST
Apply Date:
04/25/2024
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0424-00379
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
04/26/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 05/13/2024 REQUIRES RESUBMIT Review Details
06/06/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 06/17/2024 APPROVED Review Details
06/17/2024 RESTAMP - RESIDENTIAL v.1 06/21/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0424-00379
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
04/01/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00379
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/16/2024 COT - BULD - SWG Clearance N/A Not Applicable No gas service to site.
09/16/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable No gas service to site

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0424-00379
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19
Date Description Inspector Results Comments
06/24/2024 COT - RSPL - Yard Water Line Passed
06/24/2024 COT - RSPL - Sewer Passed 6/24/24: Sewer connection and rough plumbing approved. Ok to backfill. Shading required
06/24/2024 COT - RSPL - Rough Soil Passed 6/24/24: Sewer connection and rough plumbing approved. Ok to backfill. Shading required
06/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/26/2024 COT - RSBU - Preslab Passed
06/26/2024 COT - RSEL - Grounding/Bonding Passed
07/15/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 7/15/24: roof nailing passed ok to proceed, exterior clip/sheathing passed
07/15/2024 COT - RSBU - Roof Nailing Passed 7/15/24: roof nailing passed ok to proceed
07/18/2024 BULD - Electrical Clearance Passed 7/18/24: ECO TEP CLEARANCE @ 762 W PRESIDENT ST UNIT 1 AND UNIT 2
07/19/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/24/24: ensure Gray water is installed at time of intermediate inspection.
7/19/24: ok to proceed
09/16/2024 COT - RSBU - Interior Shear Bracing Passed
09/16/2024 COT - RSEL - Electrical Final Passed
09/16/2024 COT - RSEL - Electrical Underground Passed
09/16/2024 COT - RSEL - Outdoor Lighting Passed
09/16/2024 COT - RSME - Mechanical Final Passed
09/16/2024 COT - RSPL - Plumbing Final Passed
09/16/2024 ENGR Engineering Final Passed Move in ready
09/16/2024 RSBU - Building Final Passed
09/16/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW