Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/12/2023
Applicant:
Daria Hopkins
Description:
SFR MERI192021 T21-M0064

Permit Reviews

Permit Number - TC-MDP-0423-00943
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Start Date Submittal Complete Date Status  
07/13/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 07/13/2023 APPROVED Review Details
08/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00943
Permit Status: Complete
Permit Description: SFR MERI192021 T21-M0064
Date Description Comments
07/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00943
Permite Description: SFR MERI192021 T21-M0064
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
11/27/2023 BULD - Electrical Clearance N/A Canceled Canceled per contractor. 11/27/2023
11/27/2023 COT - RSPL - Gas Pressure Test N/A Canceled Canceled per contractor. 11/27/2023
01/16/2024 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 1/16/24: Drywall was installed without passing residential intermediate. Drywall will need to be removed in order for re-inspection to take place of residential intermediate.
11/27/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Canceled Canceled per contractor. 11/27/2023
03/15/2024 COT - RSEL - Outdoor Lighting N/A Canceled 3/15/24: canceled per contractor
03/15/2024 COT - RSPL - Plumbing Final N/A Canceled 3/15/24: canceled per contractor
03/15/2024 RSBU - Building Progress N/A Canceled 3/15/24: canceled per contractor

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00943
Permit Description: SFR MERI192021 T21-M0064
Total Completed Inspections - 21

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
FINAL COFO.PDF DOCUMENTS VIEW
LOT 51 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 51 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 51 SPECIAL INSPECTION CERTIFICATE-2023-07-12_V1.PDF DOCUMENTS VIEW
LOT 51 PLOT PLAN_V1.PDF DOCUMENTS VIEW