Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Partial Pass
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0423-00943
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Partial Pass
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Partial Pass | Partial-pass. Pending fresh air intake to be 10' away from all plumbing vents. | |
03/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | 3/15/24: canceled per contractor | |
03/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/21/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
11/27/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Canceled per contractor. 11/27/2023 | |
11/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Nail plate needed right side of garage, missed hold down at front door. Replace with proper substitute., disconnected duct at powder room, support 4-gang box behind powder room sink, open chase bottom plate at vent clean out in family room, connect duct at second floor, shower pans not under test, nail plates needed in master bedroom, nail plate needed at front room left side of bathroom second floor, fresh air intake to be 10’ away from all plumbing vents, dwv not under test, cold water supply for washer not properly installed, no plans on site. | |
11/30/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Missed hold down at front door. Replace with proper substitute, fresh air intake to be 10’ away from all plumbing vents. Plumbing and electrical not per plans. Revise plans to show current layout of electrical and plumbing and provide updated plans at final. | |
12/13/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | Missed hold down at front door. Replace with proper substitute., fresh air intake to be 10’ away from all plumbing vents. Plumbing and electrical not per plans. Revise plans to show current layout of electrical and plumbing and provide updated plans at final. | |
12/15/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
12/19/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Canceled | Cancelled per John. | |
12/20/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required (with fee) | House has been insulated before passing intermediate, cannot properly inspect replacement for missed hold down and front of house shear wall. Remove insulation from HTT hold down to allow proper inspection, fresh air intake to be 10’ away from all plumbing vents. Re-inspection with fee required. |