Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/21/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0423-00915
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
05/10/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 05/31/2023 APPROVED Review Details
05/03/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 05/04/2023 REQUIRES RESUBMIT Review Details
05/31/2023 RESTAMP - RESIDENTIAL v.1 06/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00915
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
05/03/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00915
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
Date Description Inspector Results Comments
06/08/2023 COT - RSPL - Rough Soil Passed
06/09/2023 COT - RSPL - Yard Water Line Passed
06/12/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade.
06/12/2023 COT - RSBU - Preslab Passed Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade.
06/12/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade.
06/26/2023 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
06/26/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/26/2023 COT - RSBU - Roof Nailing Passed
06/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/29/2023 BULD - Electrical Clearance Passed TEP ECO
07/20/2023 COT - RSPL - Sewer Passed 7/20/23: revision for sewer plan required. Ok to backfill
10/03/2023 COT - RSEL - Electrical Final Passed
10/03/2023 COT - RSBU - Interior Shear Bracing Passed
10/03/2023 COT - RSEL - Outdoor Lighting Passed
10/03/2023 COT - RSME - Mechanical Final Passed
10/03/2023 COT - RSPL - Plumbing Final Passed
10/03/2023 RSBU - Building Final Passed
10/03/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RIVERVIEW CORRECTIONS_V1.PDF DOCUMENTS VIEW