Permit: TC-MDP-0423-00915
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1321 W RIVERVIEW BL UNIT 1
Address NEW:
1321 W RIVERVIEW BL UNIT 1
Apply Date:
04/21/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0423-00915
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/10/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 05/31/2023 | APPROVED |
| 05/03/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 05/04/2023 | REQUIRES RESUBMIT |
| 05/31/2023 | RESTAMP - RESIDENTIAL v.1 | 06/05/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0423-00915
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Date | Description | Comments |
|---|---|---|
| 05/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0423-00915
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2023 | COT - RSPL - Rough Soil | Passed | ||
| 06/09/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 06/12/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade. | |
| 06/12/2023 | COT - RSBU - Preslab | Passed | Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade. | |
| 06/12/2023 | COT - RSEL - Grounding/Bonding | Passed | Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade. | |
| 06/26/2023 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 06/26/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/26/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 06/29/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/29/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
| 07/20/2023 | COT - RSPL - Sewer | Passed | 7/20/23: revision for sewer plan required. Ok to backfill | |
| 10/03/2023 | COT - RSEL - Electrical Final | Passed | ||
| 10/03/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 10/03/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/03/2023 | COT - RSME - Mechanical Final | Passed | ||
| 10/03/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 10/03/2023 | RSBU - Building Final | Passed | ||
| 10/03/2023 | ENGR Engineering Final | Passed |