Inspection Status: Passed
Inspection History: COT - RSBU - Preslab
| Date |
Description |
Inspector |
Results |
Comments |
| 06/12/2023 |
COT - RSBU - Preslab |
|
Passed |
Ufer ground is installed in footing on left side of residence. Rebar reinforcement is installed per plans into 12" deep footings. Subsoil AB is 4" thick and compacted. Okay to pour concrete for footings and slab on grade. |