Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0423-00899
Permit Details
Apply Date:
01/04/2024
Applicant:
Celina Rodriguez
Description:
SFR BT2685-228 T22-M0012
Permit Reviews
Permit Number - TC-MDP-0423-00899
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/04/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0423-00899
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
01/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
01/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
01/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
01/09/2024 | Post-Tension Inspection Report is required. |
01/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0423-00899
Permit Status: Inspections complete
Permit Description: SFR BT2685-228 T22-M0012
Date | Description | Comments |
---|---|---|
01/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00899
Permite Description: SFR BT2685-228 T22-M0012
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 4/17/24: DWV NOT UNDER TEST ON SECOND FLOOR. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0423-00899
Permit Description: SFR BT2685-228 T22-M0012
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
02/07/2024 | COT - RSPL - Rough Soil | Passed | ||
02/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
02/20/2024 | COT - RSBU - Preslab | Passed | ||
02/20/2024 | COT - RSEL - Electrical Underground | Passed | ||
02/20/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
03/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
03/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
04/17/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
04/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls are properly screwed off per the plans. Okay to proceed with tape, texture, and paint of walls and ceilings. | |
07/15/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter only | |
07/22/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is connected to sewer and under a water pressure test with no leaks in piping or joints. Okay to shade pipe and backfill trench. | |
07/24/2024 | BULD - Electrical Clearance | Passed | Okay to energize panel. ECO Clearance issued to TEP for 4610 S Verdin Valley Dr. | |
08/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
08/19/2024 | COT - RSME - Mechanical Final | Passed | ||
08/19/2024 | ENGR Engineering Final | Passed | ||
08/19/2024 | RSBU - Building Progress | Passed | ||
08/21/2024 | COT - RSEL - Electrical Final | Passed | 8/21/24: A/C unit electrical whip is secured to wall with single hole emt strap, post tension tag is attached to hose bib on front side of house, and exterior of house is being repainted so that all pvc pipes and caps will be also painted. Okay to issue Certificate of Occupancy for this project. | |
08/21/2024 | COT - RSPL - Plumbing Final | Passed | 8/21/24: A/C unit electrical whip is secured to wall with single hole emt strap, post tension tag is attached to hose bib on front side of house, and exterior of house is being repainted so that all pvc pipes and caps will be also painted. Okay to issue Certificate of Occupancy for this project. | |
08/21/2024 | RSBU - Building Final | Passed | 8/21/24: A/C unit electrical whip is secured to wall with single hole emt strap, post tension tag is attached to hose bib on front side of house, and exterior of house is being repainted so that all pvc pipes and caps will be also painted. Okay to issue Certificate of Occupancy for this project. |