Permit Reviews

Permit Number - TC-MDP-0423-00897
Permit Status: Complete
Permit Description: SFR BT2685-228 T22-M0012
Start Date Submittal Complete Date Status  
06/16/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 06/20/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0423-00897
Permit Status: Complete
Permit Description: SFR BT2685-228 T22-M0012
Total Outstanding Activity Conditions - 3
Date Name
06/15/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/16/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/16/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0423-00897
Permit Status: Complete
Permit Description: SFR BT2685-228 T22-M0012
Date Description Comments
04/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/16/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00897
Permit Description: SFR BT2685-228 T22-M0012
Total Completed Inspections - 22
Date Description Inspector Results Comments
07/12/2023 COT - RSPL - Yard Water Line Passed
07/12/2023 COT - RSPL - Sewer Passed
07/12/2023 COT - RSPL - Rough Soil Passed
08/01/2023 COT - RSPL - Backwater Valve Passed
08/01/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/01/2023 COT - RSBU - Preslab Passed
08/01/2023 COT - RSEL - Electrical Underground Passed
08/01/2023 COT - RSEL - Grounding/Bonding Passed
08/16/2023 COT - RSBU - Exterior Clips/Sheathing Passed
08/16/2023 COT - RSBU - Roof Nailing Passed
09/22/2023 COT - RSPL - Gas Pressure Test Passed
09/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/09/2023 COT - RSBU - Interior Shear Bracing Passed
10/24/2023 BULD - Electrical Clearance Passed 11/30/23 clearance resent
11/29/2023 COT - BULD - SWG Clearance Passed Okay to install meter and turn on gas.
12/14/2023 COT - RSEL - Outdoor Lighting Passed
12/14/2023 ENGR Engineering Final Passed
12/15/2023 COT - RSEL - Electrical Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 COT - RSME - Mechanical Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 COT - RSPL - Plumbing Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 RSBU - Building Final Passed 12/15/23: Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled. GFCI outlets are installed where required. Outdoor lights are installed per plan and operational. Okay to issue Certificate of Occupancy when all other agencies have completed their final inspections.
12/15/2023 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA - LOT 63 START_V1.PDF DOCUMENTS VIEW
BELLA TIERRA II 63 SIC-2023-06-15_V1.PDF DOCUMENTS VIEW
P21WP00207 FINAL ACCEPTANCE BTII_V1.PDF DOCUMENTS VIEW