Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
04/13/2023
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078

Permit Reviews

Permit Number - TC-MDP-0423-00879
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Start Date Submittal Complete Date Status  
04/17/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 04/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0423-00879
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
Date Description Comments
04/18/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
04/17/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/17/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/17/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0423-00879
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
Date Description Inspector Results Comments
06/21/2023 COT - RSPL - Rough Soil Passed
06/21/2023 COT - RSPL - Backwater Valve Passed
06/26/2023 COT - RSPL - Yard Water Line Passed
07/03/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
07/03/2023 COT - RSBU - Preslab Passed
07/03/2023 COT - RSEL - Electrical Underground Passed
07/03/2023 COT - RSEL - Grounding/Bonding Passed
07/25/2023 COT - RSBU - Exterior Clips/Sheathing Passed
07/25/2023 COT - RSBU - Roof Nailing Passed
09/11/2023 COT - RSPL - Gas Pressure Test Passed
09/11/2023 RSBU - Building Progress Passed
09/11/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/11/2023
09/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
10/11/2023 COT - RSBU - Interior Shear Bracing Passed
11/15/2023 COT - BULD - SWG Clearance Passed 11/15/23: SWG clearance issued,
11/15/2023 COT - RSPL - Sewer Passed
12/19/2023 COT - RSEL - Electrical Final Passed
12/19/2023 COT - RSEL - Outdoor Lighting Passed
12/19/2023 COT - RSME - Mechanical Final Passed
12/19/2023 COT - RSPL - Plumbing Final Passed
12/19/2023 RSBU - Building Final Passed
12/19/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 127 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 127 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 127 SPECIAL INSPECTION CERTIFICATE-2023-04-13_V1.PDF DOCUMENTS VIEW