Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
9625 E WYNALDA DR
Apply Date:
04/07/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point 1512.225 (2024 IRC) (Model Master Plan TC-MDP-0226-00088)

Permit Reviews

Permit Number - TC-MDP-0326-00158
Permit Status: Issued
Permit Description: Mirador Point 1512.225 (2024 IRC) (Model Master Plan TC-MDP-0226-00088)
Start Date Submittal Complete Date Status  
04/10/2026 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/21/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0326-00158
Permit Status: Issued
Permit Description: Mirador Point 1512.225 (2024 IRC) (Model Master Plan TC-MDP-0226-00088)
Total Outstanding Activity Conditions - 5
Date Name
03/13/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
03/13/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/14/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/14/2026 Post-Installed Anchor Inspection Report is required.
04/14/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0326-00158
Permit Status: Issued
Permit Description: Mirador Point 1512.225 (2024 IRC) (Model Master Plan TC-MDP-0226-00088)
Date Description Comments
03/13/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/13/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 192 START 2_V1.PDF DOCUMENTS VIEW
MP 192 SIC-2026-04-07_V1.PDF DOCUMENTS VIEW