Permit: TC-MDP-0326-00143
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9576 E MEOLA DR
Address NEW:
9576 E MEOLA DR
Apply Date:
03/12/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point 1768-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00089)
Permit Reviews
Permit Number - TC-MDP-0326-00143
Permit Status: Inspections complete
Permit Description: Mirador Point 1768-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00089)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/31/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/31/2026 | APPROVED |
| 03/20/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/03/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0326-00143
Permit Status: Inspections complete
Permit Description: Mirador Point 1768-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00089)
| Date | Description | Comments |
|---|---|---|
| 03/13/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 03/24/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 03/13/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/24/2026 | Post-Installed Anchor Inspection Report is required. | |
| 03/13/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/24/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 03/24/2026 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/13/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0326-00143
Permite Description: Mirador Point 1768-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00089)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 08/19/2026 | RSBU - Building Final | N/A | Partial Pass | 8-19-26. Building final approved pending ada requirements at threshold at garage door and pending conditions to be satisfied. |
| 08/21/2026 | ENGR Engineering Final | N/A | Partial Pass | Site is complete in accordance with approved plans. Outstanding conditions need to be satisfied. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0326-00143
Permit Description: Mirador Point 1768-225 (2024 IRC) (Model Master Plan TC-MDP-0226-00089)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2026 | COT - RSPL - Yard Water Line | Passed | 04/27/2026 Holding under test to meter with blue tracer. Ok to backfill, shading required. |
|
| 04/27/2026 | COT - RSPL - Rough Soil | Passed | 04/27/2026 All fixtures holding under test. Ok to backfill, shading required. |
|
| 04/27/2026 | COT - RSPL - Sewer | Passed | 04/27/2026 Holding under test to HCS with green tracer wire and backwater valve. Ok to backfill, shading required. |
|
| 05/04/2026 | COT - RSBU - Preslab | Passed | 05/04/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 05/04/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 05/04/2026 Approved per plan and reinforcement. Okay to pour. |
|
| 05/04/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 05/14/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 05/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/18/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/18/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/25/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/05/2026 | BULD - Electrical Clearance | Passed | Eco approved | |
| 08/19/2026 | COT - RSEL - Electrical Final | Passed | 8-19-26 electrical final approved | |
| 08/19/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/19/2026 | COT - RSME - Mechanical Final | Passed | 8-19-26 mechanical final approved | |
| 08/19/2026 | COT - RSPL - Plumbing Final | Passed | 8-19-26 plumbing final approved | |
| 08/19/2026 | RSBU - Building Progress | Passed | ||
| 09/11/2026 | RSBU - Building Final | Passed | ||
| 09/11/2026 | ENGR Engineering Final | Passed |