Inspection History Details
Inspection Status: Re-inspection required
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2026 | ENGR Engineering Final | Re-inspection required | Non-compliant threshold on accessible entrance. Missing grouted riprap on slope adjacent to wall foundation. Sewer cleanouts pose a trip hazard. Electrical transformer pad is on native soil with a shear drop, this will erode leaving the pad unstable. Photos attached. | |
| 08/21/2026 | ENGR Engineering Final | Partial Pass | Site is complete in accordance with approved plans. Outstanding conditions need to be satisfied. |
|
| 09/11/2026 | ENGR Engineering Final | Passed |