Permit: TC-MDP-0325-00180
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9506 E WYNALDA DR
Address NEW:
9506 E WYNALDA DR
Apply Date:
03/11/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Permit Reviews
Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/21/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 03/18/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 03/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 03/28/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 03/28/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 03/28/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
| Date | Description | Comments |
|---|---|---|
| 03/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 03/28/2025 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/28/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00180
Permite Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 05/07/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
| 06/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6/6/25: DWV not under test, seal all penetrations throughout vapor barrier, 16 gauge x1.5" strap required at over notched top plate at closet first floor, anchor bolts required at garage east shearwall, seal sleeve at kitchen island, support NM cable at kitchen pantry 48"o.c, NM cable must be properly supported from receptacle boxes, DWV requires mid way strap in wall, fresh air intake must be 10' from vent, condensate drain must be properly pitched. STOPPED INSPECTION MORE ITEMS MAY BE ADDED (only north half of 2nd story was walked). |
| 04/15/2025 | COT - RSPL - Yard Water Line | N/A | Partial Pass | Partial pass to backfill, will check water connections once meter is installed |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00180
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/15/2025 | COT - RSPL - Sewer | Passed | Passed 4/15/25 ok to backfill | |
| 04/15/2025 | COT - RSPL - Rough Soil | Passed | Passed 4/15/25 ok to backfill | |
| 04/23/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/23/25 ok to pour concrete | |
| 04/23/2025 | COT - RSBU - Preslab | Passed | Passed 4/23/25 ok to pour concrete | |
| 04/23/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/23/25 ok to pour concrete | |
| 05/12/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/12/25 Pass |
|
| 05/12/2025 | COT - RSBU - Roof Nailing | Passed | 5/12/25 All corrections made. |
|
| 06/06/2025 | BULD - Electrical Clearance | Passed | 6/6/25: ECO TEP CLEARANCE | |
| 06/06/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6-12-25: intermediates approved. | |
| 06/20/2025 | COT - RSBU - Interior Shear Bracing | Passed | Shear walls and nailing per schedule 6/20/25 | |
| 06/20/2025 | COT - RSPL - Yard Water Line | Passed | Connection made and holds 6/20/25 | |
| 08/12/2025 | COT - RSEL - Electrical Final | Passed | 8.12.25 Electrical, mechanical, and plumbing all verified. Outdoor lighting verified. APPROVED |
|
| 08/12/2025 | COT - RSEL - Outdoor Lighting | Passed | 8.12.25 Electrical, mechanical, and plumbing all verified. Outdoor lighting verified. APPROVED |
|
| 08/12/2025 | COT - RSME - Mechanical Final | Passed | 8.12.25 Electrical, mechanical, and plumbing all verified. Outdoor lighting verified. APPROVED |
|
| 08/12/2025 | COT - RSPL - Plumbing Final | Passed | 8.12.25 Electrical, mechanical, and plumbing all verified. Outdoor lighting verified. APPROVED |
|
| 08/12/2025 | ENGR Engineering Final | Passed | ||
| 08/12/2025 | RSBU - Building Final | Passed | 8.12.25 Electrical, mechanical, and plumbing all verified. Outdoor lighting verified. APPROVED |
|
| 08/12/2025 | RSBU - Building Progress | Passed |