Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9506 E WYNALDA DR
Apply Date:
03/11/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)

Permit Reviews

Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Start Date Submittal Complete Date Status  
03/21/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Activity Conditions - 5
Date Name
03/18/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/28/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/28/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/28/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0325-00180
Permit Status: Inspections complete
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Date Description Comments
03/21/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/28/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.
03/28/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00180
Permite Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
05/07/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
05/07/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas
06/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 6/6/25: DWV not under test, seal all penetrations throughout vapor barrier, 16 gauge x1.5" strap required at over notched top plate at closet first floor, anchor bolts required at garage east shearwall, seal sleeve at kitchen island, support NM cable at kitchen pantry 48"o.c, NM cable must be properly supported from receptacle boxes, DWV requires mid way strap in wall, fresh air intake must be 10' from vent, condensate drain must be properly pitched. STOPPED INSPECTION MORE ITEMS MAY BE ADDED (only north half of 2nd story was walked).
04/15/2025 COT - RSPL - Yard Water Line N/A Partial Pass Partial pass to backfill, will check water connections once meter is installed

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00180
Permit Description: Mirador Point 2037 Plan (Model master plan TC-MDP-0125-00063)
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/15/2025 COT - RSPL - Sewer Passed Passed 4/15/25 ok to backfill
04/15/2025 COT - RSPL - Rough Soil Passed Passed 4/15/25 ok to backfill
04/23/2025 COT - RSEL - Electrical Underground Passed Passed 4/23/25 ok to pour concrete
04/23/2025 COT - RSBU - Preslab Passed Passed 4/23/25 ok to pour concrete
04/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/23/25 ok to pour concrete
05/12/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/12/25
Pass
05/12/2025 COT - RSBU - Roof Nailing Passed 5/12/25
All corrections made.
06/06/2025 BULD - Electrical Clearance Passed 6/6/25: ECO TEP CLEARANCE
06/06/2025 COT - RSEL - Grounding/Bonding Passed
06/12/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-12-25: intermediates approved.
06/20/2025 COT - RSBU - Interior Shear Bracing Passed Shear walls and nailing per schedule 6/20/25
06/20/2025 COT - RSPL - Yard Water Line Passed Connection made and holds 6/20/25
08/12/2025 COT - RSEL - Electrical Final Passed 8.12.25
Electrical, mechanical, and plumbing all verified.
Outdoor lighting verified.
APPROVED
08/12/2025 COT - RSEL - Outdoor Lighting Passed 8.12.25
Electrical, mechanical, and plumbing all verified.
Outdoor lighting verified.
APPROVED
08/12/2025 COT - RSME - Mechanical Final Passed 8.12.25
Electrical, mechanical, and plumbing all verified.
Outdoor lighting verified.
APPROVED
08/12/2025 COT - RSPL - Plumbing Final Passed 8.12.25
Electrical, mechanical, and plumbing all verified.
Outdoor lighting verified.
APPROVED
08/12/2025 ENGR Engineering Final Passed
08/12/2025 RSBU - Building Final Passed 8.12.25
Electrical, mechanical, and plumbing all verified.
Outdoor lighting verified.
APPROVED
08/12/2025 RSBU - Building Progress Passed