Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
4485 S TREAT AV
Address NEW:
4485 S TREAT AV
Apply Date:
03/06/2025
Applicant:
David Evans
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0325-00175
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
05/15/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 06/06/2025 REQUIRES RESUBMIT Review Details
06/27/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 07/11/2025 APPROVED Review Details
12/31/2025 ADMINISTRATIVE v.1 12/31/2025 REQUIRES RESUBMIT Review Details
01/02/2026 ADMINISTRATIVE v.2 01/02/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0325-00175
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
03/06/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/27/2025 A ROW permit shall be obtained from the City of Tucson Department of Transportation and Mobility (DTM) prior to any work within the Public Right-of-Way.
03/06/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/02/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00175
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/28/2026 COT - BULD - SWG Clearance N/A Not Applicable
04/28/2026 COT - RSEL - Electrical Underground N/A Not Applicable
04/28/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00175
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/07/2026 COT - RSPL - Rough Soil Passed 01/07/2026
All fixtures present and holding under test in clean trench and slope. Okay to backfill, shading materials required.
01/07/2026 COT - RSPL - Sewer Passed 01/07/2026
ABS holding under test with green tracer wire to HCS. Okay to backfill, shading materials required.
01/16/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 01/16/2026
Approved per plan. Okay for concrete placement.
01/16/2026 COT - RSBU - Preslab Passed 01/16/2026
Approved per plan. Okay for concrete placement.
02/17/2026 COT - RSBU - Roof Nailing Passed 2-17-26: okay to dry-in roof.
02/18/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2-18-26: exterior clips/sheathing approved.
02/18/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-18-26: MEP's approved. Okay to continue with construction.
02/26/2026 BULD - Electrical Clearance Passed eco code TEP approved
2.26.27
02/26/2026 COT - RSEL - Grounding/Bonding Passed
04/28/2026 COT - RSBU - Interior Shear Bracing Passed
04/28/2026 COT - RSEL - Electrical Final Passed
04/28/2026 COT - RSEL - Outdoor Lighting Passed
04/28/2026 COT - RSME - Mechanical Final Passed
04/28/2026 COT - RSPL - Plumbing Final Passed
04/28/2026 COT - RSPL - Yard Water Line Passed
04/28/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
04/28/2026 RSBU - Building Final Passed
04/28/2026 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CONS-4485 TREAT_V2.PDF DOCUMENTS VIEW
CONS-TREAT_V1_DTM COMMENTS.PDF DOCUMENTS VIEW