Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
02/21/2025
Applicant:
Brandon Kempel
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)

Permit Reviews

Permit Number - TC-MDP-0325-00166
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Start Date Submittal Complete Date Status  
03/21/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/01/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0325-00166
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Total Outstanding Activity Conditions - 4
Date Name
03/05/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/26/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/26/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/26/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0325-00166
Permit Status: Inspections complete
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Date Description Comments
03/05/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/05/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/26/2025 A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0325-00166
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/15/2025 COT - RSPL - Rough Soil Passed Plumbing per plan, ok to backfill 4/15/25
04/15/2025 COT - RSPL - Sewer Passed Plumbing per plan, ok to backfill 4/15/25
04/15/2025 COT - RSPL - Yard Water Line Passed Plumbing per plan, ok to backfill 4/15/25
04/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/22/25 ok to pour concrete
04/22/2025 COT - RSBU - Preslab Passed Passed 4/22/25 ok to pour concrete
04/22/2025 COT - RSEL - Electrical Underground Passed Passed 4/22/25 ok to pour concrete
05/14/2025 COT - RSBU - Roof Nailing Passed
05/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5/27/25
Pass
06/09/2025 BULD - Electrical Clearance Passed 6-9-25: panel okay to be energized. ECO clearance issued to TEP.
06/09/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6-9-25: intermediates approved. Okay to continue with construction.
06/09/2025 COT - RSPL - Gas Pressure Test Passed 6-9-25: approved.
06/09/2025 COT - RSEL - Grounding/Bonding Passed 6-9-25: approved.
06/23/2025 COT - RSBU - Interior Shear Bracing Passed Passed 6/23/25
08/01/2025 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/1/2025
08/12/2025 COT - RSME - Mechanical Final Passed 8.12.25
Approved
08/12/2025 COT - RSEL - Outdoor Lighting Passed 8.12.25
Approved
08/12/2025 COT - RSPL - Plumbing Final Passed 8.12.25
Approved
08/12/2025 RSBU - Building Progress Passed
08/12/2025 COT - RSEL - Electrical Final Passed 8.12.25
Approved
08/14/2025 RSBU - Building Final Passed
08/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-03-17_V1.PDF DOCUMENTS VIEW