Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2025 | ENGR Engineering Final | Not Ready | Sewer clean out collar needs to be glued to pipe. It is loose | |
| 08/14/2025 | ENGR Engineering Final | Passed |