Permit: TC-MDP-0325-00163
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
10104 S ARNOLD RANCH CT
Address NEW:
10104 S ARNOLD RANCH CT
Apply Date:
04/21/2025
Applicant:
Description:
SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2 Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Permit Reviews
Permit Number - TC-MDP-0325-00163
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/23/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/30/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0325-00163
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 03/04/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 04/29/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/29/2025 | Post-Installed Anchor Inspection Report is required. |
| 04/29/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0325-00163
Permit Status: Inspections
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
| Date | Description | Comments |
|---|---|---|
| 03/04/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0325-00163
Permite Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2025 | ENGR Engineering Final | N/A | Not Ready | 10/6/25 2" Uncapped, broken pvc clean out on South side of house. The broken section is partially below grade. Dirt may have gotten into pipe. Pipe needs to be repaired and capped correctly. Remove exposed tracer wire from HCS at ROW. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0325-00163
Permit Description: SFR RKK35I T21-M0091, Revision-1 frame walk redlines, Revision-2
Structural calcs and Post grade, Revision V3 7/21/2023 - Structural revision. (Model master plan TC-MDP-1222-00138)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | COT - RSPL - Rough Soil | Passed | 6/6/25: plumbing underground and HCS connection per approved plans. System was under 5' static pressure, ok to backfill. | |
| 06/06/2025 | COT - RSPL - Sewer | Passed | ||
| 06/12/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/12/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 06/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6-16-25: preslab, excavation, reinforcement and setbacks verified per plans. Okay to pour concrete | |
| 06/16/2025 | COT - RSBU - Preslab | Passed | 6-16-25: preslab, excavation, reinforcement and setbacks verified per plans. Okay to pour concrete | |
| 06/30/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 6/30/25 | |
| 06/30/2025 | COT - RSBU - Roof Nailing | Passed | Passed 6/30/25 | |
| 07/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/25/2025 | BULD - Electrical Clearance | Passed | 7/25/25 TEP CLEARANCE: ECO |
|
| 07/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7.28.25 Satisfactory corrections made. Proceed. |
|
| 08/04/2025 | COT - RSBU - Interior Shear Bracing | Passed | 8.4.25 Fastener schedule verified |
|
| 09/19/2025 | COT - BULD - SWG Clearance | Passed | Southwest Gas Clearance: SWG | |
| 10/06/2025 | COT - RSEL - Electrical Final | Passed | ||
| 10/06/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 10/06/2025 | COT - RSME - Mechanical Final | Passed | ||
| 10/06/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 10/06/2025 | RSBU - Building Final | Passed | ||
| 10/06/2025 | RSBU - Building Progress | Passed |