Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
03/25/2024
Applicant:
Description:
SFR K35O T21-M0036

Permit Reviews

Permit Number - TC-MDP-0324-00350
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Start Date Submittal Complete Date Status  
03/25/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0324-00350
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Total Outstanding Activity Conditions - 4
Date Name
03/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/22/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
03/26/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0324-00350
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Date Description Comments
03/22/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00350
Permit Description: SFR K35O T21-M0036
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/23/2024 COT - RSPL - Backwater Valve Passed
04/23/2024 COT - RSPL - Rough Soil Passed 4/23/24: ok to backfill. Shading required
04/23/2024 COT - RSPL - Sewer Passed 4/23/24: ok to backfill. Shading required
04/23/2024 COT - RSPL - Yard Water Line Passed 4/23/24: ok to backfill. Shading required
04/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/29/2024 COT - RSBU - Preslab Passed
04/29/2024 COT - RSEL - Electrical Underground Passed
04/29/2024 COT - RSEL - Grounding/Bonding Passed
05/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/29/2024 COT - RSBU - Roof Nailing Passed
06/24/2024 BULD - Electrical Clearance Passed
06/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/24/2024 COT - RSPL - Gas Pressure Test Passed
07/10/2024 COT - RSBU - Interior Shear Bracing Passed
08/15/2024 COT - BULD - SWG Clearance Passed 8/15/24: SWG Clearance for meter tag
09/03/2024 RSBU - Building Progress Passed
09/05/2024 ENGR Engineering Final Passed
09/05/2024 COT - RSEL - Outdoor Lighting Passed
09/09/2024 COT - RSEL - Electrical Final Passed
09/09/2024 COT - RSME - Mechanical Final Passed
09/09/2024 COT - RSPL - Plumbing Final Passed
09/09/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-03-25_V1.PDF DOCUMENTS VIEW