Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSPL - Plumbing Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/03/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 9/3/24: cut cleanouts to grade, clean out at driveway missing, properly install entry door weather strip, panel schedule must be area specific. Thermostat must be max 54" above floor. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
| 09/05/2024 | COT - RSPL - Plumbing Final | Re-inspection required | 9/3/24: cut cleanouts to grade, clean out at driveway missing, properly install entry door weather strip, panel schedule must be area specific. Thermostat must be max 54" above floor. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. 9/5/24: thermostats must be no more than 54" above finish grade, window must be replaced on second floor. all other items have been corrected |
|
| 09/09/2024 | COT - RSPL - Plumbing Final | Passed |