Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
03/20/2024
Applicant:
Joshua Swinney
Description:
Harding SFR Model La Estancia (roof vent update)

Permit Reviews

Permit Number - TC-MDP-0324-00340
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date Submittal Complete Date Status  
03/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/27/2024 APPROVED Review Details
10/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/14/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00340
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date Description Comments
03/27/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/20/2024 Post-Tension Inspection Report is required.
03/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
03/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00340
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/22/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00340
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/22/2024 COT - RSPL - Sewer Passed
05/22/2024 COT - RSPL - Rough Soil Passed
05/31/2024 COT - RSEL - Electrical Underground Passed
05/31/2024 COT - RSBU - Preslab Passed
05/31/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/31/2024 COT - BULD - SWG Clearance Passed
07/18/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/18/2024 COT - RSBU - Roof Nailing Passed
09/06/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/6/2024
09/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. Corrections were made. 9/18/2024
10/01/2024 COT - RSBU - Interior Shear Bracing Passed PASSED 10/1/2024
11/27/2024 COT - RSEL - Electrical Final Passed 11-25-24, plumbing, outdoor lighting, mechanical, electrical, and building finals are all approved.
11/27/2024 COT - RSEL - Grounding/Bonding Passed 11-25-24, verified and approved.
11/25/2024 COT - RSEL - Outdoor Lighting Passed 11-25-24, outdoor lighting final approved.
11/27/2024 COT - RSME - Mechanical Final Passed 11-25-24, plumbing, outdoor lighting, mechanical, electrical, and building finals are all approved.
11/25/2024 COT - RSPL - Plumbing Final Passed 11-25-24, plumbing final approved.
11/27/2024 COT - RSPL - Yard Water Line Passed 11-25-24, verified and approved.
11/27/2024 RSBU - Building Progress Passed 11-25-24, plumbing, outdoor lighting, mechanical, electrical, and building finals are all approved.
11/26/2024 RSBU - Building Final Passed 11-26-24, building final approved
12/09/2024 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA DE TUCSON PHASE II BELLA VITA - PARCEL 6 FINAL SIC - LOT 6030-2024-10-10_V1.PDF DOCUMENTS VIEW
Z350 HARDING- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 30 PLOT PLAN_V1.PDF DOCUMENTS VIEW