Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/22/2024 | ENGR Engineering Final | Not Ready | No address Clean out needs to be glued Landscape is a mess on the right side |
|
| 11/27/2024 | ENGR Engineering Final | Re-inspection required | Cleanout not glued down. | |
| 12/03/2024 | ENGR Engineering Final | Not Ready | Several issues with standing water in front yard, does not seam to be draining and pudling up | |
| 12/04/2024 | ENGR Engineering Final | Passed | CO Ready |