Permit: TC-MDP-0324-00317
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
39 E VALESKA RD
Address NEW:
39 E VALESKA RD
Apply Date:
03/18/2024
Applicant:
Description:
DPLX SWC2152 T21-M0059 Truss calcs satisfied
Permit Reviews
Permit Number - TC-MDP-0324-00317
Permit Status: Inspections complete
Permit Description: DPLX SWC2152 T21-M0059 Truss calcs satisfied
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/19/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 05/01/2024 | APPROVED |
| 05/01/2024 | RESTAMP - RESIDENTIAL v.1 | 05/06/2024 | APPROVED |
| 03/18/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 04/03/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0324-00317
Permit Status: Inspections complete
Permit Description: DPLX SWC2152 T21-M0059 Truss calcs satisfied
| Date | Description | Comments |
|---|---|---|
| 03/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00317
Permite Description: DPLX SWC2152 T21-M0059 Truss calcs satisfied
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 11/20/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00317
Permit Description: DPLX SWC2152 T21-M0059 Truss calcs satisfied
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2024 | COT - RSPL - Rough Soil | Passed | 5/20/24: plumbing underground per plans ok to backfill. Shading required | |
| 05/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5/21/24: reinforcement per plan ok to proceed | |
| 05/21/2024 | COT - RSBU - Preslab | Passed | 5/21/24: passed ok to proceed | |
| 05/21/2024 | COT - RSPL - Sewer | Passed | 5/20/24: Partial pass. 3' pending to HCS connection. Ok to backfill progress area. Shading required 5/21/24: HCS connection made. |
|
| 05/31/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/31/24: exterior clips/sheathing inspection passed. Ok to proceed | |
| 05/31/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 06/10/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 06/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/21/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 07/26/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 7/26/2024 | |
| 07/30/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/12/2024 | BULD - Electrical Clearance | Passed | 11/12/24 clearance for units 1 and 2 TEP CLEARANCE ECO | |
| 11/20/2024 | ENGR Engineering Final | Passed | Property was locked up but I was able to get a good visual of all 4 sides. This property is CO Ready. | |
| 11/20/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/21/2024 | COT - RSEL - Electrical Final | Passed | 11/21/24 corrections have been made | |
| 11/21/2024 | COT - RSEL - Electrical Underground | Passed | 11/21/24 corrections have been made | |
| 11/21/2024 | COT - RSPL - Plumbing Final | Passed | 11/21/24 corrections have been made | |
| 11/21/2024 | COT - RSME - Mechanical Final | Passed | 11/21/24 corrections have been made | |
| 11/21/2024 | RSBU - Building Final | Passed | 11/21/24 corrections have been made | |
| 11/21/2024 | RSBU - Building Progress | Passed | 11/21/24 corrections have been made |